Page 80 - Beaumont Basin Watermaster - DRAFT 2016 Annual Report
P. 80
813.8 687.4
- 4,278.7 5,042.3 4,980.4 6,305.8 8,287.3 10,621.0 10,810.2 9,484.8 5,029.5 3,476.2 10,813.8 80,631.2
Total
813.8 687.4 777.7 541.3 823.4 881.8 16.5 9.2 17.8
- 1,047.4 1,222.3 1,842.0 1,827.2 10,507.8
SGPWA 3
Supplemental Recharge (ac-ft)
- - - 3,501.0 4,501.0 2,399.0 2,741.2 5,727.0 7,979.0 7,783.0 7,403.0 4,405.0 2,773.0 9,319.0 58,531.2
BCVWD 1
Table 3-4 Annual Supplemental Recharge to the Beaumont Basin -- Calendar Year Accounting Beaumont 2 - - - - - - - - - - - - - -
- - - - - 1,534.0 2,741.2 1,338.0 800.0 1,200.0 1,200.0 608.0 694.0 1,477.0 11,592.2
Banning 1 1.- SWP water recharged in the BCVWD Noble Creek Recharge Facility technical demonstration of the estimated amount of rechar
Year 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Totals