Page 17 - Beaumont Basin Watermaster
P. 17
BEAUMONT BASIN WATERMASTER
MEMORANDUM NO. 16-09
Date: June 1, 2016
From: Hannibal Blandon, ALDA Inc.
Subject: Status Update on the Refinement of the Beaumont Basin
Groundwater Flow Model
Recommendation: No recommendation.
At the April Board meeting, the Watermaster Committee authorized ALDA Inc., in
association with Thomas Harder and Company, to conduct a refinement of the
groundwater model in the northwest portion of the Beaumont Basin.
The effort to refine the model in that area has been completed and is documented in the
attached technical memorandum.
The updated model will be used to determine the change in storage that took place in
2015 and the resulting operating safe yield. As a result of this additional work, production
of the annual report will be delay until the August 2016 regular Board meeting.
Beaumont Basin Watermaster - June 1, 2016 - Page 17 of 91
MEMORANDUM NO. 16-09
Date: June 1, 2016
From: Hannibal Blandon, ALDA Inc.
Subject: Status Update on the Refinement of the Beaumont Basin
Groundwater Flow Model
Recommendation: No recommendation.
At the April Board meeting, the Watermaster Committee authorized ALDA Inc., in
association with Thomas Harder and Company, to conduct a refinement of the
groundwater model in the northwest portion of the Beaumont Basin.
The effort to refine the model in that area has been completed and is documented in the
attached technical memorandum.
The updated model will be used to determine the change in storage that took place in
2015 and the resulting operating safe yield. As a result of this additional work, production
of the annual report will be delay until the August 2016 regular Board meeting.
Beaumont Basin Watermaster - June 1, 2016 - Page 17 of 91