Page 7 - Beaumont Basin Watermaster
P. 7

Member Warsinski provided several comments on the item, stating that he was
                              in agreement with the Resolution as stated today.

                              Member Zoba pointed out a conflict in prior overlying designations where the
                              Watermaster provided for a specific amount of acre feet to go to a parcel but
                              is now silent as to what happens in the redetermination of safe yield.  Member
                              Zoba stated that he felt that issue has been addressed in Resolution 2017-02,
                              and that the Resolution is good in terms of the amount and works procedurally.

                              Chairman Vela spoke in support of deferring the Resolution and held a vote on
                              the original motion by Member Lara, seconded by Member Armstrong, to defer
                              the  vote  until  the  next  meeting,  and  it  passed  3-2,  with  Members  Lara,
                              Armstrong, and Vela in favor and Members Warsinski and Zoba opposed.

                              John  Ohanian  requested  that  the  Watermaster  hold  a  special  meeting  the
                              following month to revisit Resolution 2017-02.  Mike Turner requested that the
                              Watermaster approve the Resolution today with modified language to address
                              the concerns brought up by several Members.

                              After  further  discussion  of  a  special  meeting  and  dates  proposed  for  said
                              meeting, Member Zoba moved to schedule a special meeting for August 30,
                              2017 at 11: 00 a.m., to review Resolution 2017-02.  The motion was seconded
                              by Member Lara and passed 5-0.

               C.      2016 Consolidated Annual Report and Engineering Report  – Presentation of Draft
                       Report [Memorandum No. 17-19, Page 20 of 34]

                              Recommendation:  No recommendation - For discussion.

                              Engineer  Blandon  presented  the  draft  2016  Annual  Report,  which  included
                              discussion of groundwater conditions, groundwater production and recharge,
                              transfers and adjustment of rights, and accounting of the storage.

                              Tom Harder, hydrogeologist for the Watermaster, next spoke about water level
                              trends across the basin as well as the operating safe yield for the basin.

                              Engineer Blandon concluded the presentation of the draft 2016 Annual Report
                              with an analysis and discussion of water quality in the basin, detailing levels
                              of  common  analytes  in  each  well,  and  provided  recommendations  to  be
                              considered by the Watermaster in the future.

               D.      Status Report on Water Level Monitoring throughout the Beaumont Basin through
                       July 24, 2017 [Memorandum No. 17-20, Page 21 of 34]

                              Recommendation:  No recommendation.

                              Engineer Blandon gave a status report of the water level monitoring being done
                              at thirteen locations throughout the basin.







                                     Beaumont Basin Watermaster - February 7, 2018 - Page 7 of 48
   2   3   4   5   6   7   8   9   10   11   12