BEAUMONT BASIN WATERMASTER

                                          MEMORANDUM NO. 19-03

               Date:                    February 6, 2019

               From:                    Hannibal Blandon, ALDA Inc.

               Subject:                 Status Report on the Development of a Return Flow Methodology
                                        for the Beaumont Basin

               Recommendation:          None – For Information Purposes Only


               The  purpose  of  this  Technical  Memorandum  is  to  provide  an  update  on  the  work
               conducted under Task No. 17 to develop a Return Flow Accounting Methodology.

               In consideration of the fact that irrigation return flow contributes to the Safe Yield of the
               Beaumont  Basin,  the  Beaumont  Basin  Watermaster  Board  directed  ALDA/Thomas
               Harder & Co. (ALDA/TH&Co) to develop a methodology to account for the return flow that
               occurs overlying each Appropriator service area.  The work was begun in October 2018.
               To date, we have conducted the following work:

                   ▪  Obtained  2017  water delivery  records from the  Beaumont-Cherry  Valley Water
                       District (BCVWD), City of Banning, and Yucaipa Valley Water District.

                   ▪  Correlated  water account  addresses  to  Assessor’s  Parcel Numbers (APNs) for
                       BCVWD and the City of Banning

                   ▪  Began developing a return flow accounting methodology based on a review of the
                       available water delivery records from the Appropriators.

               It is noted that our scope of work assumed that the Appropriators would provide records
               correlated to APNs.  However, as BCVWD and the City of Banning did not have the
               resources to conduct this work, it was necessary for ALDA/TH&Co to correlate the water
               delivery accounts to APNs.  This work was out of scope.

               The following work remains to be conducted;

                   ▪  Reconcile approximately 100 unidentified accounts for BCVWD

                   ▪  Finish correlating City of Banning water delivery accounts to APNs (90 percent
                       complete)
                   ▪  Finalize the return flow analysis methodology

                   ▪  Prepare the seepage lag analysis
                   ▪  Prepare the Technical Memorandum documenting study