Page 266 - Yucaipa Valley Water District - Board Workshop
P. 266
Workshop Memorandum 16-012



Date: January 12, 2016

Subject: Groundwater and Surface Water Monitoring Related to the Yucaipa
Valley Water District’s Maximum Benefit Monitoring Program


Yucaipa Valley Water District is required to c onduct extensive monitoring for the Maximum Benefit
Program in the San Timoteo and Yucaipa Management Zones pursuant to the Regional Water
Quality Control Board (RWQCB) Resolution Nos. R8-2005-0065 and R8-2014-0005.

The following scope of work and fee are based on monitoring requirements included in Resolution
No. R8-2014-0005. The Monitoring will include groundwater monitoring services at up to fourteen
(14) wells in the San Timoteo Management Zone and three (3) wells in the Beaumont
Groundwater Management Zone. This will include collecting groundwater quality samples from
nine of the wells. Surface water monitoring services at up to four (4) surface water monitoring
points in the San Timoteo Management Zone will also be conducted bi-weekly.

All data collected in the field (e.g. groundwater level measurements, surface water flows) will be
compiled in a database, along with analytical laboratory results for all water quality samples
collected by Dudek. Dudek will manage the data for the San Timoteo Creek, Yucaipa, and
Beaumont Management Zones. This includes collecting, reviewing, providing QA/QC, and
compiling all groundwater and surface water data from the three management zones.

The District is currently under contract with Dudek for the 2015 groundwater and surface water
monitoring for the San Timoteo Management Zone. This proposal covers the monitoring
requirements for the 2016 calendar year.


































Yucaipa Valley Water District - January 12, 2016 - Page 262 of 279
   261   262   263   264   265   266   267   268   269   270   271