Page 33 - Yucaipa Valley Water District
P. 33
Workshop Memorandum 18-005
Date: January 9, 2018
From: Mike Kostelecky, Operations Manager
Matthew Porras, Management Analyst
Subject: Status Report on the Slope Repairs at Drinking Water Reservoir 15.1
On October 17, 2017, the Board of Directors authorized the District staff to contract with Rock
Structures Construction Company to assist with the slope repair at the R-15.1 Reservoir site
[Director Memorandum No. 17-094].
The purpose of this memorandum is to provide an update on the status of the repairs.
Yucaipa Valley Water District - January 9, 2018 - Page 32 of 175

