Page 14 - Yucaipa Valley Water District
P. 14
V. Operational Updates
A. Overview of Recent Telemetry and Communication Issues [Workshop
Memorandum No. 18-032] - Operations Manager Mike Kostelecky provided an
overview of recent telemetry and communication issues.
B. Overview of Water Mainline Breaks and Associated Issues [Workshop
Memorandum No. 18-033] - General Manager Joseph Zoba and Public Works
Manager John Wrobel provided an overview of water mainline breaks and
associated issues.
C. Investigations Related to the Biological Treatment Systems at the Wochholz
Regional Water Recycling Facility [Workshop Memorandum No. 18-034] - General
Manager Joseph Zoba provided an overview of the investigations related to the
biological treatment systems at the Wochholz Regional Water Recycling Facility.
D. Overview of Yucaipa Valley Water District’s Lead Sampling Program for K-12
Schools and compliance with the 2017 Permit Amendment and Assembly Bill 746
[Workshop Memorandum No. 18-035] - Senior Plant Operator Tim Mackamul
provided an overview Yucaipa Valley Water District’s Lead Sampling Program for
K-12 schools and compliance with the 2017.
E. Evaluation of Existing Belt Press Equipment at the Wochholz Regional Water
Recycling Facility [Workshop Memorandum No. 18-036] - General Manager
Joseph Zoba provided an overview of the evaluation of existing belt press
equipment at the Wochholz Regional Water Recycling Facility.
VI. Capital Improvement Projects
A. Status Report on the Emergency Coating Repairs for Drinking Water Reservoir
17.1.1 [Workshop Memorandum No. 18-037] - Operations Manager – Water Mike
Kostelecky provided a status report on the emergency coating repairs for drinking
water reservoir 17.1.1.
B. Status Report on the Slope Repairs at Drinking Water Reservoir 15.1 [Workshop
Memorandum No. 18-038] - Management Analyst Matthew Porras provided a
status report on the slope repairs at drinking water reservoir 15.1.
C. Status Report on the Replacement of Primary Clarifier Equipment at the Wochholz
Regional Water Recycling Facility [Workshop Memorandum No. 18-039] - General
Manager Joseph Zoba provided a status report on the replacement of primary
clarifier equipment at the Wochholz Regional Water Recycling Facility.
D. Status Report on the Construction of a Replacement Public Works Building
[Workshop Memorandum No. 18-040] - Management Analyst Matthew Porras
provided a status report on the construction of a replacement public works building.
E. Status Report on the Construction of an 8-Inch Sewer Mainline in Yucaipa
Boulevard [Workshop Memorandum No. 18-041] - Management Analyst Matthew
Porras provided a status report on the construction of an 8-inch sewer mainline in
Yucaipa Boulevard.
F. Status Report on the Implementation of Advanced Metering Infrastructure
[Workshop Memorandum No. 18-042] - Management Analyst Matthew Porras
provided a status report on the implementation of Advanced Metering
Infrastructure.
Yucaipa Valley Water District - Board Workshop Minutes Page 2 of 4
Yucaipa Valley Water District - February 6, 2018 - Page 14 of 175