V.      Operational Updates
                       A.     Overview  of  Recent  Telemetry  and  Communication  Issues  [Workshop
                              Memorandum No. 18-032] - Operations Manager Mike Kostelecky provided an
                              overview of recent telemetry and communication issues.

                       B.     Overview  of  Water  Mainline  Breaks  and  Associated  Issues  [Workshop
                              Memorandum  No.  18-033]  - General  Manager  Joseph  Zoba  and  Public  Works
                              Manager  John  Wrobel  provided  an  overview  of  water  mainline  breaks  and
                              associated issues.
                       C.     Investigations  Related  to  the  Biological  Treatment  Systems  at  the  Wochholz
                              Regional Water Recycling Facility [Workshop Memorandum No. 18-034] - General
                              Manager Joseph Zoba provided an overview of the investigations related to the
                              biological treatment systems at the Wochholz Regional Water Recycling Facility.
                       D.     Overview  of  Yucaipa  Valley  Water  District’s  Lead  Sampling  Program  for  K-12
                              Schools and compliance with the 2017 Permit Amendment and Assembly Bill 746
                              [Workshop  Memorandum  No.  18-035]  -  Senior  Plant  Operator  Tim  Mackamul
                              provided an overview Yucaipa Valley Water District’s Lead Sampling Program for
                              K-12 schools and compliance with the 2017.
                       E.     Evaluation  of  Existing  Belt  Press  Equipment  at  the  Wochholz  Regional  Water
                              Recycling  Facility  [Workshop  Memorandum  No.  18-036]  -  General  Manager
                              Joseph  Zoba  provided  an  overview  of  the  evaluation  of  existing  belt  press
                              equipment at the Wochholz Regional Water Recycling Facility.
               VI.     Capital Improvement Projects
                       A.     Status Report on the Emergency Coating Repairs for Drinking Water Reservoir
                              17.1.1 [Workshop Memorandum No. 18-037] - Operations Manager – Water Mike
                              Kostelecky provided a status report on the emergency coating repairs for drinking
                              water reservoir 17.1.1.
                       B.     Status Report on the Slope Repairs at Drinking Water Reservoir 15.1 [Workshop
                              Memorandum  No.  18-038]  -  Management  Analyst  Matthew  Porras  provided  a
                              status report on the slope repairs at drinking water reservoir 15.1.
                       C.     Status Report on the Replacement of Primary Clarifier Equipment at the Wochholz
                              Regional Water Recycling Facility [Workshop Memorandum No. 18-039] - General
                              Manager  Joseph  Zoba provided  a  status report  on  the  replacement  of primary
                              clarifier equipment at the Wochholz Regional Water Recycling Facility.
                       D.     Status  Report  on  the  Construction  of  a  Replacement  Public  Works  Building
                              [Workshop  Memorandum  No.  18-040]  -  Management  Analyst  Matthew  Porras
                              provided a status report on the construction of a replacement public works building.
                       E.     Status  Report  on  the  Construction  of  an  8-Inch  Sewer  Mainline  in  Yucaipa
                              Boulevard [Workshop Memorandum No. 18-041] - Management Analyst Matthew
                              Porras provided a status report on the construction of an 8-inch sewer mainline in
                              Yucaipa Boulevard.
                       F.     Status  Report  on  the  Implementation  of  Advanced  Metering  Infrastructure
                              [Workshop  Memorandum  No.  18-042]  -  Management  Analyst  Matthew  Porras
                              provided  a  status  report  on  the  implementation  of  Advanced  Metering
                              Infrastructure.






               Yucaipa Valley Water District - Board Workshop Minutes                               Page 2 of 4
                                    Yucaipa Valley Water District - February 6, 2018 - Page 14 of 175
   9   10   11   12   13   14   15   16   17   18   19