Page 10 - Yucaipa Valley Water District - Board Workshop
P. 10

Kansas
          Kansas Bostwick Irrigation District, Open Lateral Conversion to Buried Pipeline System
          Reclamation Funding: $300,000                             Total Project Cost: $650,151

          The Kansas Bostwick Irrigation District, in northern Kansas, will convert 4.1 miles of open lateral canal
          into a buried pipeline system.  The project is expected to conserve 724 acre-feet of water annually, which is
          currently lost to evaporation, seepage and operational spills.  The water conserved will allow for reduced
          diversions from the Republican River.

          Southwest Kansas Groundwater Management District No. 3, Installation of a SCADA System and
          Ditch Lining on the Farmers Ditch
          Reclamation Funding: $300,000                             Total Project Cost: $1,612,148
          The Southwest Kansas Groundwater Management District No. 3, located in western Kansas, will install a
          new head gate with a Supervisory Control and Data Acquisition system and line 3 miles of earthen canal
          with water impervious clay.  The project is expected to save 498 acre-feet of water per year, currently lost
          to seepage and over deliveries. The water conserved as a result of this project will offset the need to pump
          water from the Ogallala Aquifer.

          Montana
          Malta Irrigation District, Exeter Siphon Project
          Reclamation Funding: $300,000                             Total Project Cost: $845,020

          The Malta Irrigation District, located on the Milk River in northern Montana, will replace the existing
          Exeter Siphon with a new, geosynthetic lined canal embankment across Exeter Creek.  The project also
          includes the installation of a series of culverts to pass creek flows and storm runoff to protect the canal
          embankment, which will also help to restore the creek bed for wildlife habitat and recreation. A large debris
          collection system will also be installed as part of the project to reduce spills by preventing plugging of the
          culverts. The project is expected to result in annual water savings of 2,500 acre-feet, currently lost due to
          leakage and spills, and is expected to improve the quantity and quality of water in the Milk River.
          Pondera County Canal and Reservoir Company, E Canal Regulating Reservoir Project
          Reclamation Funding: $170,000                             Total Project Cost: $350,281

          The Pondera County Canal and Reservoir Company in northern Montana will construct an embankment
          dam across an existing canal to create a regulating reservoir. The project will provide short-term water
          storage and allow for more consistent downstream water delivery. The project is expected to conserve
          1,191 acre-feet of water annually, currently lost to seepage in the E Canal. Conserved water will be used to
          meet existing demands.

          Nebraska

          Upper Republican Natural Resources District, Remote Water Metering and Conservation Project
          Reclamation Funding: $300,000                             Total Project Cost: $768,844

          The Upper Republican Natural Resources District, located in northwestern Nebraska, will upgrade 1,018
          flow meters with digital registers and radio modules to transmit water usage information and crop
          evapotranspiration rates via a radio network. This information will allow farmers in the area to better match
          irrigation volumes with actual crop needs.  The project is expected to reduce irrigation water use in the area






                                       Yucaipa Valley Water District - October 9, 2018 - Page 10 of 172
   5   6   7   8   9   10   11   12   13   14   15