Director Memorandum 18-141
Date: November 6, 2018
Prepared By: John Wrobel, Public Works Manager
Subject: Authorization to Execute a Contract with J.B. Paving & Engineering for
Roadway Improvements to Mountain View Lane, Yucaipa
Recommendation: That the Board authorize the General Manager to execute a contract
with J.B. Paving & Engineering for a sum not to exceed $105,250.
The District staff continuously
evaluates the condition of the
water system infrastructure on
a regular basis. Through this
evaluation, the District is able
to identify water mainlines and
other assets that are in need of
repair or replacement.
The water mainline on
Mountain View Lane was an
old 4-inch steel pipe that was
subject to numerous leaks.
The District staff replaced
1,200 linear feet of water main,
replaced twenty-four services,
three hydrants, and an air
vacuum appurtenance. To
complete this project, the
District staff recommends
repaving this private street.
District staff solicited three bids from local paving contractors with the following results.
Contractor Amount
JB Paving $105,250
Roquet Construction $107,711
PacWest Engineering $115,640
Based on the results above, the District staff recommends that the Board of Directors award the
contract to JB Paving for a sum not to exceed $105,250.