Page 5 - Beaumont Basin Watermaster
P. 5
Beaumont Basin Watermaster
2013 Reevaluation of the Beaumont Basin Safe Yield 3-Apr-15
6.1 Safe Yield Based on Historical Land Use and Basin Management ............................... 36
6.2 Safe Yield Based on Future Projections of Land Use and Basin Management ............. 37
6.3 Findings .......................................................................................................................... 39
7.0 Summary of Findings and Recommendations .................................................................. 40
7.1 Recommended Safe Yield for the Beaumont Basin ....................................................... 41
7.2 Other Recommendations ................................................................................................ 41
8.0 References ............................................................................................................................. 43
Tables
1 Hydraulic Conductivity Distribution by Aquifer Based on Downhole Flowmeter Test
Results
2 Groundwater Budget for the Beaumont Model
3 Summary of Return Flow Rates
4 Residential and Commercial Return Flow Analysis
5 Return Flow Subdivided by Appropriator
6 Artificial Recharge Summary
7 40-Yr Historical Groundwater Budget for the Beaumont Basin Adjudicated Area
8 2013 through 2032 Projected Groundwater Budget for the Beaumont Basin
Adjudicated Area
Figures
1 Regional Map
2 Beaumont Basin Study Area
3 Conceptual Water Balance – Pre-developed Conditions
4 Conceptual Water Balance – Developed Conditions
5 Data Type Diversity Flow Chart
6 Jurisdictional Areas
7 Historical Land Use in the Beaumont Basin
8 Changes in Historical Land Use 1974 – 2010
iv