Section 2
                                                                                           Watermaster Activities



                         federal standards with the exception of a well which exceeds the notification level for
                         Vanadium.


                      ƒ  Discussion Regarding Task Order No. 15 with ALDA Inc. for the Preparation of the 2017
                         Consolidated Annual Report, Estimate of the Safe Yield, Update of the Groundwater
                         Model, and Associated Consulting Services for 2018 [Memorandum 18-03].  Mr. Blandon
                         explained the scope of services and indicated that it was the same scope and cost as for
                         2017.  The task order was approved unanimously for the amount not to exceed $95,970.

                      ƒ  Discussion Regarding Task Order No. 16 with ALDA Inc. for the Installation,
                         Maintenance, and Data Collection of Water Level Monitoring Equipment in CY 2018
                         [Memorandum 18-04]. After Engineer Blandon provided an overview of the consulting
                         services provided under this task, the Committee approved Task Order No. 16 for a sum
                         not to exceed $21,520.00.

                      ƒ  Presentation of Preliminary Recharge and Recovery Scenarios for Analysis to Estimate
                         Storage Losses in the Beaumont Basin – Project Progress Update [Memorandum 18-05].
                         Mr. Harder explained that a number of scenarios were evaluated, explained the model,
                         and indicated that on the east side of the basin about 20 percent of the water put into
                         recharge is lost.  He further indicated that additional imported water recharged by the
                         SGPWA will increase water losses from the basin by an estimated 17 percent.

                      ƒ  Watermaster Committee Adjourn to Closed Session.

                      ƒ  Consideration of Resolution No. 2018-01 Rescinding Resolution No. 2017-01 and
                         Approving the Groundwater Storage Application in the Beaumont Basin for the San
                         Gorgonio Pass Water Agency in the Amount of 10,000 ac-ft [Memorandum 18-06].
                         Counsel Thierry Montoya reported that in an effort to resolve the ongoing litigation with
                         the SGPWA there have been ongoing dialog with SGPWA’s counsel and a resolution
                         has been discussed.  The Watermaster Committee agreed to accept the changes with
                         some exceptions related to the Section 8 of the Rules and Regulations.  A Resolution to
                         Confirm and Adopt SGPWA’s Application for Groundwater Storage Agreement was
                         unanimously approved subject to stated conditions.  A copy of the final resolution is
                         attached under Appendix “A”.

                  Items Discussed During the March 28, 2018 Regular Watermaster Committee Meeting
                      ƒ  Status Report on Water Level Monitoring throughout the Beaumont Basin through March
                         19, 2018 [Memorandum 18-07]. Engineer Blandon indicated that he is considering one or
                         two additional monitoring wells in the Banning area.  He reported that the well casing in
                         Banning 8 may have collapsed during his visit as the water level probe was lost at 350 ft
                         below surface.  He reported that YVWD has been subject to vandalism resulting in the
                         loss of three water level and barometric probes.

                      ƒ  2017 Consolidated Annual Report and Engineering Report – Presentation of Final Report
                         [Memorandum 18-08]. Engineer Blandon reported that the draft report was presented at
                         the previous meeting and comments were incorporated into the final document. He