1. Meeting Minutes for February 7, 2018
AYES: Jaggers, Jakher, Jorritsma, Vela
NOES: None.
ABSTAIN: None.
ABSENT: Zoba
STATUS: Motion Approved
VII. Reports
A. Report from Engineering Consultant - Hannibal Blandon, ALDA
Engineering
Mr. Blandon drew attention to copies of the final 2017 Consolidated
Annual Report.
B. Report from Legal Counsel – Keith McCollough, Alvarado Smith
Legal Counsel Keith McCollough all issues have been resolved with the
San Gorgonio Pass Agency relative to the settlement agreement and the
storage agreement has been executed.
VIII. Discussion Items
A. Status Report on Beaumont Basin Water Level Monitoring Program
through March 19, 2018
Recommendation: No recommendation.
Engineer Hannibal Blandon noted he has been talking to Tom
Harder about one or two additional monitoring wells in the
Banning area.
At Yucaipa 34 last week, two probes (water level and barometric)
were gone. Staff will try to fish them out of the bottom of the
well if they are there. In the Noble Creek area, the shallow
aquifer levels have increased by 85 feet in the last few months.
Mr. Blandon reported on monitoring of existing wells. He noted
that Banning 8 has appeared to collapse. The probe has been
removed and it remains to be determined whether it will be
available for monitoring again.
BCVWD wells 2 and 25 have increased water levels. Wells outside
the Banning area are also being sought to monitor water levels.
BEAUMONT BASIN WATERMASTER – COMMITTEE MINUTES 2018-03-28 PAGE 3 of 6
Beaumont Basin Watermaster - June 6, 2018 - Page 6 of 27