Director Memorandum 17-008




                Date:              January 3, 2017

                Prepared By:       Brent Anton, Engineering Manager

                Subject:           Award of a Construction Contract for the 30-Inch Potable Water Conveyance
                                   Pipeline – Phase III and the 8-Inch Acacia Avenue Pipeline


                Recommendation:        That the Board awards a construction contract to Borden Excavating,
                                       Inc. for a sum not to exceed $618,577.


               On November 1, 2016, the Board of Directors authorized the District staff to solicit bids for the
               construction of pipelines on Acacia Avenue and First Street [Director Memorandum No. 16-104].
               The pipeline project involves two pipes:
                     948 linear feet of 30-inch ductile iron pipe in First Street, west on Acacia Avenue to Second
                       Street; and
                     1005 linear feet of 8-inch ductile iron pipe in First Street and Acacia Avenue to the alley
                       east of California Street.

               The 30-inch ductile iron pipe is an extension of the existing 30-inch crosstown transmission
               pipeline in Second Street, east on Acacia Avenue and south on First Street to Yucaipa Boulevard
               and the 8-inch ductile iron pipe will support the infrastructure needs of the new Performing Arts
               Center replacing an old 6-inch PVC alley pipeline.

               This project is categorically exempt from environmental review in accordance with the California
               Environmental Quality Act Guidelines Section 15301(c).