Director Memorandum 17-008
Date: January 3, 2017
Prepared By: Brent Anton, Engineering Manager
Subject: Award of a Construction Contract for the 30-Inch Potable Water Conveyance
Pipeline – Phase III and the 8-Inch Acacia Avenue Pipeline
Recommendation: That the Board awards a construction contract to Borden Excavating,
Inc. for a sum not to exceed $618,577.
On November 1, 2016, the Board of Directors authorized the District staff to solicit bids for the
construction of pipelines on Acacia Avenue and First Street [Director Memorandum No. 16-104].
The pipeline project involves two pipes:
948 linear feet of 30-inch ductile iron pipe in First Street, west on Acacia Avenue to Second
Street; and
1005 linear feet of 8-inch ductile iron pipe in First Street and Acacia Avenue to the alley
east of California Street.
The 30-inch ductile iron pipe is an extension of the existing 30-inch crosstown transmission
pipeline in Second Street, east on Acacia Avenue and south on First Street to Yucaipa Boulevard
and the 8-inch ductile iron pipe will support the infrastructure needs of the new Performing Arts
Center replacing an old 6-inch PVC alley pipeline.
This project is categorically exempt from environmental review in accordance with the California
Environmental Quality Act Guidelines Section 15301(c).
Yucaipa Valley Water District - January 3, 2017 - Page 57 of 120