Workshop Memorandum 17-069
Date: May 30, 2017
From: Kathryn Hallberg, Management Analyst
Subject: Status Report on the Construction of the Site Improvements for the Recycled
Water Booster Station 12.4.0 in Calimesa
On January 31, 2017, the Board of Directors awarded the contract to TSR Construction and
Inspection for the construction of the site improvements at RWB- 12.4 Recycled Booster Station
at the intersection of Myrtlewood Drive and California Street in Calimesa
The project includes the construction of 315± linear feet of 8-foot 8-inch to 12-foot high masonry
walls with masonry pillars, 200± linear feet of 8-foot high steel tubular fencing with access gates,
site grading and furnishing, Class 2 base material, and site landscaping.