Page 63 - Yucaipa Valley Water District
P. 63

Director Memorandum No. 17-067                                                       Page 3 of 6



                                                RESOLUTION NO. 2017-20

                     A RESOLUTION OF THE YUCAIPA VALLEY WATER DISTRICT UPDATING THE
                    METHODOLOGY USED TO CALCULATE EMPLOYEE BENEFIT, ADMINISTRATIVE
                    OVERHEAD, AND SURCHARGE FACTORS FOR COST RECOVERY OF CERTAIN
                                         SERVICES PROVIDED BY THE DISTRICT


                       WHEREAS, the Yucaipa Valley Water District regularly invoices property owners and
               developers  on  a  time  and  material  basis  to  recover  costs  associated  with  specific  work
               associated with various projects; and,

                       WHEREAS, a portion of the time and material cost charged to a project requires a
               specific  methodology  to  determine  employee  benefits,  administrative  overhead,  and  bill
               processing surcharges.


                       NOW, THEREFORE, BE IT RESOLVED by the Board of Directors, that the Yucaipa
               Valley Water District does hereby establish the following factors to be used in the calculation of
               charges for time and material based services:

               1.      Employee Benefit Factor:  The Employee Benefit Factor shall be 49.1%.  Attachment
                       “A” illustrates the manner in which the Employee Benefit Factor was calculated.

                2.     Administrative Overhead Factor:  The Administrative Overhead Factor shall be 13.6%.
                       Attachment “A” illustrates the manner in which the Administrative Overhead Factor was
                       calculated.

                3.     Administrative Surcharge:  An Administrative Surcharge equal to 1.5% shall be applied
                       to all outside service charges generated by consultants and contractors for all District
                       related projects.

                4.     Benefit & Overhead Calculation Methodology:  Attachment “B” illustrates how the factors
                       established above will be used to calculate total project cost.

                5.     Hourly Labor Rates:  The calculated hourly labor rate shall be updated on a regular
                       basis to reflect the sum of the range maximum in effect for each job position plus the
                       benefit factor plus the overhead factor as provided in Attachment “B.”

               This resolution should take effect immediately and shall apply to all active and future projects.




















                                     Yucaipa Valley Water District - August 1, 2017 - Page 63 of 76
   58   59   60   61   62   63   64   65   66   67   68