Director Memorandum No. 18-022                                                      Page 9 of 22



                              4.6    Annual Budgeting and Expenditure Approval.

                                     4.6.1  The fiscal year of the GC shall be July 1 through June 30.  The GC
               shall develop, circulate, and approve an annual budget for the funding of bringing imported water
               supply  to  the  Basin,  and  for  the  maintenance  and  repair  of  groundwater  recharge  or  water
               conveyance facilities serving replenishment of the Basin.  The Budget shall be prepared by a
               Budget Committee, which shall consist of three (3) member Parties of the GC appointed by a
               qualifying vote of at least 80% of the weighted Equitable Allocation, no later than January 31 of
               the fiscal year prior to the one for which the budget is to operate.  The Budget Committee shall
               coordinate with BTAC and Valley District as the State Water Project Contractor, to determine the
               likely allocation of available State Water Project imported water supplies, and other available non-
               native sources of imported water, the likely unit cost of such imported water, and the recharge
               needs of the Basin, in terms of quantities of water, locations where Basin conditions would most
               benefit  from  imported  recharge,  condition  and  availability  of  facilities  to  accomplish  such
               recharge,  and  cost.    From  these  sources,  the  Budget  Committee  shall  prepare  a  budget  that
               recommends all of the following:

                                     (a)    the amount of imported water supplies proposed to be bought or
               otherwise acquired by GC members in the coming year;

                                     (b)    the recommended application or distribution of such imported water
               supplies to various parts of the Basin;

                                     (c)    the estimated cost of all ongoing maintenance, repair, and operation
               costs for then-existing groundwater recharge and conveyance facilities serving to replenish the
               Basin;

                                     (d)    any administrative costs of the GC; and


                                     (e)    proposed allocation of all expenditures in the Budget among GC
               members as their portion of the Cost Share based upon the Equitable Allocation Model.


                                     4.6.2  No later than March 1 prior to the beginning of the year for which
               the budget is to operate, the Budget Committee shall present and circulate to all GC members the
               proposed Budget, for review and analysis.  The circulated budget shall include the underlying
               presumptions and worksheets upon which it is based.  The Budget Committee, or its designee,
               shall make itself reasonably available to respond promptly to any inquiries or information requests
               regarding the proposed budget.

                                     4.6.3  No later than sixty (60) days after presentation of the budget by the
               Budget Committee, the GC shall meet to deliberate and pass upon the budget.  The GC may accept,
               reject, or modify in any way the budget as proposed by the Budget Committee.  Adoption of the
               budget shall require an eighty percent (80%) vote of the weighted Equitable Allocation, provided,
               however, that if a segregable portion or portions of the budget can be identified which prevent the
               overall budget from obtaining an eighty percent (80%) approval vote, the GC shall pass those
               portions of the budget upon which an eighty percent (80%) majority can be achieved, and shall
               refer those portions upon which approval cannot be obtained back to the Budget Committee for
               further recommendation on how such portions might be eliminated, reduced in scope or cost, or