Director Memorandum No. 18-022                                                     Page 19 of 22



                                                             Exhibit B

                                            EQUITABLE ALLOCATION METHOD




                       The Parties to this agreement have agreed to equitably share costs and establish the
               voting weight for each Party using the following method, which shall be performed annually
               after the annual submittal of the Western-San Bernardino Watermaster Report to the Court.  The
               details for this method are included in a Microsoft Excel Spreadsheet titled BTAC Equitable
               Allocation Method SBBA 1.18.18.xlsx, as amended by the GC from time to time, which is
               incorporated here by reference.  Copies of that file have been made available to all parties.


               I.      Calculation of the Equitable Operations and Maintenance (O&M) Cost.

               The equitable distribution of the O&M Costs amongst the Parties shall be calculated from the
               approved budget, as follows:

                       Equitable O&M Cost  Plaintiffs = 0.2795 x O&M Costs

                       Equitable O&M Cost  Non Plaintiffs = Proportion of Total Pumping x 0.7205 x O&M Costs


                       where,
                              O&M Costs = annual budgeted or actual costs to operate and maintain the facilities needed
                              to recharge supplemental water into the SBBA that have been reviewed and approved by
                              the Council

                              Proportion of Total Pumping (%) =      Party’s total SBBA pumping
                                                                 Non-Plaintiff Total SBBA Pumping

                             where,

                                   Party’s total SBBA pumping (acre-feet) = the Party’s total amount pumped from the SBBA
                                   for the previous complete calendar year, as published by the Western-San Bernardino
                                   Watermaster, and adjusted for any water pumped by one Party and received by another
                                   Party,  to coordinate with non-parties still paying the groundwater charge, Parties may be
                                   requested to report production to the SBVWCD, as needed.

                                   Non-Plaintiff Total SBBA Pumping (acre-feet) = total Non-Plaintiff pumping of the parties
                                   for the previous complete calendar year, as recorded by the Western-San Bernardino
                                   Watermaster.

               II.     Calculation of the Equitable Water Cost.

               The equitable distribution of the water cost for sustainability will only be paid by the Non-
               Plaintiff parties and shall be calculated, as follows:

                       Equitable Water Cost = Party Gap + Sustainability


                       where,