Page 9 - Yucaipa Valley Water District
P. 9

Analyst Matthew Porras discussed the implementation plan for implementing the
                              Automated Meter Infrastructure throughout the District’s service area.
               VI.     Capital Improvement Projects
                       A.     Status Report on the 5  Street Widening Project [Workshop Memorandum No. 18-
                                                    th
                              114]  -  Management  Analyst  Matthew  Porras  provided  a  status  report  on  the
                                                                                                th
                              proposed agreement with the City of Yucaipa for improvements on 5  Street.
                       B.     Status  Report  on  the  Emergency  Repairs  for  Drinking  Water  Reservoir  17.1.1
                              [Workshop Memorandum No. 18-115] - Operations Manager Michael Kostelecky
                              provided an update on the status of the Reservoir 17.1.1 rehabilitation.
                       C.     Status  Report  on  the  Annual  Repairs  and  Rehabilitation  of  the  Yucaipa  Valley
                              Regional  Water  Filtration  Facility  [Workshop  Memorandum  No.  18-116]  -
                              Operations Manager Michael Kostelecky provided an update on the status of the
                              annual work at the Yucaipa Valley Regional Water Filtration Facility.
               VII.    Public Policy

                       A.     Discussion Regarding Draft Resolution No. 2018-xx Establishing a Development
                              Policy Related to Accessory Dwelling Units and Other Multiple Unit Developments
                              [Workshop Memorandum No. 18-117] - General Manager Joseph Zoba discussed
                              the development of a policy related to accessory dwelling units and other multiple
                              unit developments.
                       B.     Discussion  Regarding  Draft  Resolution  No.  2018-xx  Updating  the Water  Meter
                              Installation Fees for Drinking Water and Recycled Water and Identifying the Use
                              of 50” Water Meter Boxes for Drinking Water and Recycled Water Infrastructure
                              [Workshop Memorandum No. 18-118] - General Manager Joseph Zoba discussed
                              a  draft  Resolution  No.  2018-xx  updating  the  water  meter  installation  fees  for
                              Drinking Water and Recycled Water and identifying the use of 50” water meter
                              boxes for Drinking Water and Recycled Water Infrastructure.
               VIII.   Development Projects
                       A.     Overview of a Proposed Development Agreement with Western Pacific Housing
                              for the Development of 121 lots in Calimesa - Portions of Tract Nos. 26925, 30386,
                              and 30386-1 [Workshop Memorandum No. 18-119] - General Manager Joseph
                              Zoba discussed the draft development agreement for portions of Tract Nos. 26925,
                              30386, and 30386-1.
                       B.     Overview  of  a  Proposed  Development  Agreement  with  Lennar  Homes  for  the
                              Summerwind  Development  -  Calimesa  [Workshop  Memorandum  No.  18-120]  -
                              Management  Analyst  Matthew  Porras  provided  an  overview  of  a  proposed
                              Development Agreement with Lennar Homes for the Summerwind Development
                              in Calimesa.
                       C.     Overview of a Proposed Development Agreement for a Commercial Carwash on
                              Yucaipa Boulevard, Yucaipa [Workshop Memorandum No. 18-121] - Management
                              Analyst  Matthew  Porras  provided  an  overview  of  a  proposed  Development
                              Agreement for a commercial carwash on Yucaipa Boulevard, Yucaipa.
               IX.     Administrative Items

                       A.     Review of Amendment No. 2 to SRF Loan-Brineline- Agreement No. 09-864-550
                              8 [Workshop Memorandum No. 18-122] - Chief Financial Officer Allison Edmisten





               Yucaipa Valley Water District - Board Workshop Minutes                               Page 2 of 3
                                          Yucaipa Valley Water District - May 1, 2018 - Page 9 of 92
   4   5   6   7   8   9   10   11   12   13   14