Page 129 - Yucaipa Valley Water District
P. 129

Director Memorandum No. 19-007                                                       Page 2 of 3



                                             RESOLUTION NO. 2019-04

                               RESOLUTION OF THE BOARD OF DIRECTORS OF THE
                       YUCAIPA VALLEY WATER DISTRICT UPDATING THE WATER METER
                      INSTALLATION FEE FOR DRINKING WATER AND RECYCLED WATER


               WHEREAS, the Yucaipa Valley Water District (the “District”) has updated the cost for installing
               drinking water and recycled water meters based on the latest actual cost evaluation associated
               with providing this service; and

               WHEREAS, the District has updated the water meter service standards and individual parts list
               to  address  residential  fire  sprinkler  requirements,  dual-plumbed  backflow  protection,  and
               automated meter infrastructure technology; and

               WHEREAS, the District staff has presented the cost information and options for cost recovery at
               publicly noticed board workshops.

                                                  ____________________


               NOW,  THEREFORE,  the  Board  of  Directors  of  Yucaipa  Valley  Water  District,  based  on  the
               foregoing Recitals, do hereby RESOLVE, DETERMINE, AND ORDER as follows:


               1.      Drinking Water and Recycled Water Meter Installation Charge.  The cost associated with the
                       installation of water meters shall be as follows:

                                                                                              Water Meter
                                     Classification of Water Meter Installation
                                                                                             Installation Fee
                        ¾” Drinking Water Meter Installation                                      $499


                        ¾” Recycled Water Meter Installation                                      $499

                        1” Recycled Water Meter Installation                                      $593

                        1” Drinking Water Meter Installation with Fire Sprinklers                 $866
                        1” Drinking Water Meter Installation with Fire Sprinklers at a Dual-
                        Plumbed Residential Dwelling                                             $1,026

                       The Water Meter Installation Fee shall be paid prior to scheduling the installation of the water
                       meter.

               2.      Larger Drinking Water and Recycled Water Meter Installation Charge.  The charge for the
                       installation of a larger water meter and/or a water meter classification not provided above
                       shall be the actual cost of all labor, material, and equipment charges, plus employee benefits,
                       overhead, and administrative surcharges pursuant to the latest District resolution.  A deposit
                       of the estimated water meter installation cost shall be paid prior to scheduling the work.  Any
                       variance from the estimated water meter installation cost shall be remedied by District staff





                                      Yucaipa Valley Water District - January 15, 2019 - Page 127 of 184
   124   125   126   127   128   129   130   131   132   133   134