Director Memorandum 19-013



                Date:              January 15, 2019

                Prepared By:       Matthew Porras, Implementation Manager

                Subject:           Ratification  of  Agreement  No.  2019-01  -  Infrastructure  Construction  and
                                   Coordination Agreement with Western Heights Water Company

                Recommendation:        That the Board ratifies Agreement No. 2019-01.

               As discussed at the Board Workshop on February 13, 2018 [Workshop Memorandum 18-060],
               the District received six bids for the Yucaipa Boulevard sewer extension project.  Weka, Inc. was
               the low bidder in the amount of $526,193.

               On February 20, 2018 at a regular Board Meeting [Director Memorandum 18-035] the Board of
               Directors awarded a construction contract with Weka, Inc. to complete the project.  The entire
               project  includes  the  installation  and  construction  of  approximately  2,550  linear  feet  of  8-inch
               Vitrified Clay Pipe, including manholes, laterals and appurtenances.

               The  project  is  currently  underway  and
               during  discussions  with  Western  Heights
               Water  Company  (WHWC),  an  option  to
               complete  the  installation  of  an  additional
               190  feet  in  Ridgecrest  Drive  has  become
               available.  WHWC has agreed to move their
               water  line  to  accommodate  the  remaining
               section of the sewer line to be installed in
               Ridgecrest  Drive.    The  cooperation
               between the District and WHWC is valuable
               to  the  community  and  the  protection  of
               groundwater  through  future  elimination  of
               septic systems within the basin.

               The  attached  Infrastructure  Construction
               and Coordination Agreement is an effort on
               behalf  the  District  and  WHWC.    The
               construction  contract  that  has  been
               awarded to Weka Inc. for the installation of
               sewer infrastructure in Yucaipa Boulevard
               includes a section of Ridgecrest Drive.  The
               current  contract  excludes  approximately
               190’ of the sewer line in Ridgecrest Drive
               that would connect to Sierra Lina Street.  District staff is working with Weka Inc. to get an estimate
               for the work as designed.  The additional cost will be presented at a future board meeting along