Page 8 - Yucaipa Valley Water District
P. 8
DM 19-006 Water Resource Manager Jennifer Ares discussed the
consideration of a Rain Barrel Rebate Program for water
CONSIDERATION OF A conservation.
RAIN BARREL REBATE
PROGRAM FOR Director Bruce Granlund moved the Board make a motion to
WATER continue the item. Director Lonni Granlund seconded the
CONSERVATION motion.
The motion was approved by the following vote:
Director Chris Mann - Yes
Director Bruce Granlund - Yes
Director Lonni Granlund - Yes
Director Jay Bogh - Yes
Director Joyce McIntire - Yes
DM 19-007 Implementation Manager Matthew Porras discussed Resolution
No. 2019-04 updating the water meter installation fees for
ADOPTION OF drinking water and recycled water.
RESOLUTION NO.
2019-04 UPDATING Director Bruce Granlund moved that the Board adopt Resolution
THE WATER METER No. 2019-04. Director Joyce McIntire seconded the motion.
INSTALLATION FEE
FOR DRINKING WATER The motion was approved by the following vote:
AND RECYCLED Director Chris Mann - Yes
WATER Director Bruce Granlund - Yes
Director Lonni Granlund - Yes
Director Jay Bogh - Yes
Director Joyce McIntire - Yes
DM 19-008 Implementation Manager Matthew Porras discussed the
purchase of temporary pipe materials for the Calimesa Lakes
CONSIDERATION OF Recharge Project.
PURCHASING
TEMPORARY PIPE Director Lonni Granlund moved that the Board authorize the
MATERIALS FOR THE General Manager to execute a contract for purchase of
CALIMESA LAKES temporary pipe materials for the Calimesa Lakes Recharge
RECHARGE STUDY Study. Director Joyce McIntire seconded the motion.
The motion was approved by the following vote:
Director Chris Mann - Yes
Director Bruce Granlund - Yes
Director Lonni Granlund - Yes
Director Jay Bogh - Yes
Director Joyce McIntire - Yes
Yucaipa Valley Water District Page 4 of 7
Yucaipa Valley Water District - February 5, 2019 - Page 8 of 74