Page 5 - Yucaipa Valley Water District - Board Workshop
P. 5

Workshop Memorandum 19-124



                Date:          June 11, 2019

                From:          Matthew Porras, Implementation Manager

                Subject:       Overview of the Proposed Construction Contract for the Wildwood Canyon Road
                               Sewer Mainline Replacement Project

               Emergency  Short  Term  Repair  Background: The  District  operates  and maintains  a gravity
               sewer line located south of Wildwood Canyon Road and west of the Wildwood Creek Basin.  On
               February 18, 2019 District staff identified asset # WW-PIP-0295, the segment of sewer main line
               that is adjacent to Yucaipa Creek, was damaged due to the recent storm water that had washed
               out  the  bedding  of  the  sewer  main
               line,  leaving  the  pipe  exposed,
               severing  at  a  joint  and  causing  a
               leak.  The mid-February storm, that
               occurred from February 13-15, 2019
               has been identified as CDAA 2019-
               02  by  the  Governor’s  Office  of
               Emergency      Services.        The
               emergency  repair  due  to  incident
               CDAA 2019-02, has been completed
               and  is  temporarily  suspended  and
               restrained as pictured.

               Long  Term  Solution  -  Project
               Description:       Although      the
               temporary  emergency  repair  has
               been  completed,  a  permanent
               relocation  is  required  to  mitigate
               future  damage.    The  relocation
               project will include the installation of
               a new 10” diameter segment of sewer mainline, approximately 1,300 linear feet long, in Wildwood
               Canyon Road and bypass the damaged segment of sewer.         This installation will eliminate the
               need to make the additional repairs to the creek bedding and rock structure as the damaged
               segment of pipe will be removed from service but remain intact to allow for future use if necessary.
               The design of this segment is attached and will bridge the gap between two existing segments of
               live sewer and convey the existing flows within Wildwood Canyon Road.

















                                         Yucaipa Valley Water District - June 11, 2019 - Page 5 of 95