Drewelow Remediation Equipment, Inc.
            A MINORITY WOMAN OWNED, CERTIFIED SMALL BUSINESS SINCE 1993


                 Move Equipment from Existing Site to the Next Site - Mobilization, Setup and Startup -  billed per
                 location for up to 2 week rental period per location - Fire hydrant water source within 1000 feet of location.
                                          Description                        Units   Unit Cost  Extended Cost
                 Mileage                                                     180      $1.10       $198.00
                 Travel time                                                  6       $75.00      $450.00
                 Engineer                                                     8      $165.00     $1,320.00
                 Specialist 3                                                 8       $85.00      $680.00
                 Rental Equipment - manifold - equipped with pressure regulator, pressure gauges, hand valves   1  $700.00  $700.00
                 and flow meters
                 Rental Equipment - basin tree - equipped with float valves and switches  1  $850.00  $850.00
                 Rental Equipment - telemetry system - calls out on high and low water alarms  1  $250.00  $250.00
                 Rental Equipment - fire hose - 3 inch fire hose              20      $50.00     $1,000.00
                 Sub contractor - general contractor - dig hole, setup pipeline from fire hydrant  1  $3,827.20  $3,827.20
                 Sub contractor - temporary fence company - move fence from existing site to next site  1  $712.50  $712.50
                 Sub contractor - portable restroom                           1      $280.00      $280.00
                 Sub total                                                                       $10,267.70
                 Sales Tax                                                            9.00%       $344.45
                 Total                                                                           $10,612.15




                 List Price Schedule for Rental Items - Cost per week
                                                    Description                                 Extended Cost
                 Manifold                                                                         $350.00
                 Basin Tree - equipped with 3 float valves                                        $425.00
                 Telemetry System - sends text and email measure when alarm occurs. Cellular system.  Solar powered.  $125.00
                 Fire hose - cost per week per 50 foot section of 3 inch fire hose                $25.00
                 Traffic ramps to protect fire hose at road crossings - $20 per week per two foot section of heavy duty traffic ramp,  rating
                 25,000lbs/tire                                                                   $20.00
                 21,000 gallon closed top steel roll off tank - estimated delivery $640, estimated pickup charge $640, estimated cost to   $367.50
                 more tank between site $640.  These charges are per location for event.



                 Total Preliminary Cost

                                          Description                        Units   Unit Cost  Extended Cost
                 Setup first two sites                                        2      $9,568.20   $19,136.40
                 Site visit                                                   14     $668.00     $9,352.00
                 Move equipment from existing site to the next site           11    $10,612.15   $116,733.63
                 Site demobilization                                          13     $6,625.20   $86,127.60
                 Total preliminary cost                                                         $231,349.63

















                              1523 Sterling Court  Escondido, CA 92029  Phone: 760-546-6456  Fax: 760-546-6476   www.dre-equip.com