Page 85 - _ 180314 Special Yucaipa GSA Packet
P. 85
NOTIFICATION OF LAKE OR STREAMBED ALTERATION
9. PROJECT CATEGORY AND WORK TYPE (Check each box that applies)
NEW REPLACE REPAIR/MAINTAIN
PROJECT CATEGORY
CONSTRUCTION EXISTING STRUCTURE EXISTING STRUCTURE
Bank stabilization – bioengineering/recontouring □ □ □
Bank stabilization – rip-rap/retaining wall/gabion □ □ □
Boat dock/pier □ □ □
Boat ramp □ □ □
Bridge □ □ □
Channel clearing/vegetation management □ □ □
Culvert □ □ □
Debris basin □ □ □
Dam □ □ □
Diversion structure – weir or pump intake □ □ □
Filling of wetland, river, stream, or lake □ □ □
Geotechnical survey □ □ □
Habitat enhancement – revegetation/mitigation □ □ □
Levee □ □ □
Low water crossing □ □ □
Road/trail □ □ □
Sediment removal – pond, stream, or marina □ □ □
Storm drain outfall structure □ □ □
Temporary stream crossing □ □ □
Utility crossing : Horizontal Directional Drilling □ □ □
Jack/bore □ □ □
Open trench □ □ □
Other (specify): □ □ □
FG2023 Page 4 of 9 Rev. 1/13
Yucaipa Groundwater Sustainability Agency - March 14, 2018 - Page 81 of 226