Page 85 - _ 180314 Special Yucaipa GSA Packet
P. 85

NOTIFICATION OF LAKE OR STREAMBED ALTERATION


       9. PROJECT CATEGORY AND WORK TYPE (Check each box that applies)

                                                           NEW                REPLACE              REPAIR/MAINTAIN
                    PROJECT CATEGORY
                                                      CONSTRUCTION      EXISTING STRUCTURE      EXISTING STRUCTURE
        Bank stabilization – bioengineering/recontouring     □                    □                       □

        Bank stabilization – rip-rap/retaining wall/gabion   □                    □                       □

        Boat dock/pier                                       □                    □                       □

        Boat ramp                                            □                    □                       □

        Bridge                                               □                    □                       □

        Channel clearing/vegetation management               □                    □                       □

        Culvert                                              □                    □                       □

        Debris basin                                         □                    □                       □

        Dam                                                  □                    □                       □

        Diversion structure – weir or pump intake            □                    □                       □

        Filling of wetland, river, stream, or lake           □                    □                       □

        Geotechnical survey                                  □                    □                       □

        Habitat enhancement –  revegetation/mitigation       □                    □                       □

        Levee                                                □                    □                       □

        Low water crossing                                   □                    □                       □

        Road/trail                                           □                    □                       □

        Sediment removal – pond, stream, or marina           □                    □                       □

        Storm drain outfall structure                        □                    □                       □

        Temporary stream crossing                            □                    □                       □

        Utility crossing :   Horizontal Directional Drilling   □                  □                       □

                          Jack/bore                          □                    □                       □

                          Open trench                        □                    □                       □

         Other (specify):                                    □                    □                       □












        FG2023                                                                                    Page 4 of 9                                                                                             Rev. 1/13

                                  Yucaipa Groundwater Sustainability Agency - March 14, 2018 - Page 81 of 226
   80   81   82   83   84   85   86   87   88   89   90