Page 118 - Beaumont Basin Watermaster
P. 118
2013 Reevaluation of the
Beaumont Basin Watermaster 3-Apr-15 Beaumont Basin Safe Yield
Map Features
§ ¨ ¦
10
Estimated Hydraulic Conductivity (ft/day)
28
18 < 25
24
25 - 50
50 - 75
2 > 75
10
3 Percent Coarse Sediment
1
8 20 - 30
68
30 - 40
13
40 40
4 49 1 87 40 - 50
29 65 Cherry Valley Blvd.
363 22
35 0 50 - 60
30
43 34 60 - 70
25 35 Brookside Ave.
15
4 17 70 - 80
80 - 90
17
4 20
90 - 100
63 42
Extent of Analysis
U V 12 41 72 Highland Springs Ave. Surficial or Alluvial Deposists
60
Beaumont Ave.
17
10 Pleistocene San Timoteo Deposits
5 86
7 17
38 15 Tertiary San Timoteo and other
7 Tertiary Sedimentary Deposits
19 Crystalline Basement Complex
§ ¨ ¦
10
4 26 3 Study Area
Beaumont Basin Adjudicated Area
1 Major Street
Ü 1 Freeway/Highway
0 0.5 1 2
Miles
NAD 83 State Plane Zone 6 Hydraulic Conductivity
Upper Aquifer
Figure 23