VII. Reports
A. Report from Engineering Consultant – Tom Harder, ALDA Engineering
Mr. Harder requested that any comments on the draft Beaumont Basin
Storage Loss Analysis to be submitted soon.
B. Report from Legal Counsel – Thierry Montoya, Alvarado Smith
Legal Counsel Thierry Montoya drew attention to the May 15, 2018
water right transfer memorandum in follow up to a request at the prior
meeting regarding transfer of overlying rights to appropriative rights via
sale or other transfer permitted by the judgment.
VIII. Discussion Items
A. Status Report on Beaumont Basin Water Level Monitoring Program
through May 29, 2018
Recommendation: No recommendation.
Engineer Hannibal Blandon advised that a new temporary probe
has been installed at Well 29. At Oak Valley #5 a communications
cable is not working, but water levels have been stable within 6
feet. The Noble Creek observation wells have seen a significant
rise over the last year and a half. On the south side, the Summit
Cemetery varies due to pumping at a nearby well. The Sun lakes
well is fairly flat. On the east, Banning well 8 had lost the probe.
It will be pulled and a new probe will be installed this summer.
Well 15 has a flat levels, but Well 9 shows some fluctuating due
to nearby pumping. Two wells centrally located show significant
variation due to pumping. Potential for additional monitoring wells
is being pursued on a property owned by the Catholic Diocese,
and at YVWD Lift Station #2.
B. Consideration of the Watermaster Budget for Fiscal Year 2018-19
Recommendation: That the Watermaster Committee approve the
budget for Fiscal Year 2018-019 and authorize the preparation of
an Independent Accountant’s Financial Report for Fiscal Year
2017-18.
4667987.1 -- N1356.1