Mr. Blandon reported on some needed repairs: a communications cable
                              for Beaumont well 29 and Well 2, and Oak Valley 5. He noted that many
                              wells are older with sharp edges and when the cable is pulled up, it is
                              cut.
                              Mr. Warsinski asked about the issues with contracts. He noted that he
                              had  to  explain  to  the  ICON  manager  the  benefits  to  the  region.  Mr.
                              Blandon explained that the smaller overlying users, although willing to
                              have the probe installed, tend to balk at the signing of a contract.
                              Chair Vela asked about the communications cable issues. Mr. Blandon
                              answered that data is still being collected. The probe is pulled, the data
                              extracted from the probe, then it is lowered back into the well.

                              Engineer  Blandon  advised  there  are  plenty  of  existing  wells  of  which
                              ownership  is  unknown;  many  are  monitored  by  the  USDS  and  San
                              Gorgonio  Pass  Water  Agency.  A  probe  could  easily  be  installed.  He
                              suggested this is an issue to consider.


                       C.     Status Report on the Development of a Return Flow Methodology for
                              the Beaumont Basin

                                     Recommendation: No recommendation.


                              Mr. Ben Lewis with Thomas Harder and Company explained that he has
                              the needed data from BCVWD, YVWD and the City of Banning and has
                              correlated water accounts to Assessor’s Parcel Numbers or addresses
                              for  BCVWD  and  Banning,  which  was  out  of  scope.  YVWD  provided
                              records tied to an APN. Mr. Lewis said he hopes they can finish the work
                              and stay within budget.

                              Mr. Lewis reported that the development of the return flow methodology
                              has begun, detailed some tasks, and said he expects to provide the draft
                              technical memorandum by the March 27 meeting.

                       D.     Presentation  of  the  Draft  2018  Consolidated  Annual  Report  and
                              Engineering Report.


                                     Recommendation: No recommendation.


                              Engineer Blandon presented the draft 2018 report.

                              Only one resolution, 2018-01 was adopted in 2018, rescinding 2017-01
                              which gives the San Gorgonio Pass Water Agency the right to store up
                              to 10,000 acre-feet of water in the basin.