The motion was approved by the following vote:
Director Jay Bogh - Yes
Director Bruce Granlund - Absent
Director Lonni Granlund - Yes
Director Chris Mann - Yes
Director Joyce McIntire - Yes
Director Joyce McIntire moved to adopt Resolution No. 2019-09 as
presented. Director Jay Bogh seconded the motion.
The motion was approved by the following vote:
Director Jay Bogh - Yes
Director Bruce Granlund - Absent
Director Lonni Granlund - Yes
Director Chris Mann - Yes
Director Joyce McIntire - Yes
IV. Operational Updates
A. Status Report on the Annual Repairs and Rehabilitation of the Yucaipa Valley
Regional Water Filtration Facility [Workshop Memorandum No. 19-054] - General
Manager Joseph Zoba provided an update on the status of the annual
rehabilitation of the Yucaipa Valley Regional Water Filtration Facility.
B. Overview of Performing a Root Cause Analysis to Study and Resolve Foaming
Issue at the Wochholz Regional Water Recycling Facility [Workshop Memorandum
No. 19-055] - General Manager Joseph Zoba and Operations Manager Charles
Thomas provided information about the methodology to study proposed
improvements at the Wochholz Regional Water Recycling Facility.
V. Capital Improvement Projects
A. Overview of Change Order No. 1 and Notice of Completion for the Contract with
Borden Excavating for the Drinking Water Replacement Project in Oak Glen Road,
Citi-Bank / Yucaipa Boulevard, Douglas Street, Cornell Drive, Cornell Court,
Cornell Lane, and Auburn Avenue [Workshop Memorandum No. 19-056] -
Implementation Manager Matthew Porras provided an overview of the Notice of
Completion and Change Order No. 1.
B. Status Report on the Construction of an 8-Inch Sewer Mainline in Yucaipa
Boulevard [Workshop Memorandum No. 19-057] - Implementation Manager
Matthew Porras provided an overview of the sewer mainline construction in
Yucaipa Boulevard.
C. Change Order No. 1 for the Contract with Weka Inc. for the Yucaipa Boulevard
Sewer Main Installation Project [Workshop Memorandum No. 19-058] -
Implementation Manager Matthew Porras provided an overview of Change Order
No. 1 for the sewer mainline project in Yucaipa Boulevard.
D. Status Report on the Infiltration Testing at the Calimesa Lake and Spreading Basin
Recharge Facility [Workshop Memorandum No. 19-059] - Implementation