Page 10 - Yucaipa Valley Water District
P. 10

The motion was approved by the following vote:
                                            Director Jay Bogh - Yes

                                            Director Bruce Granlund - Absent
                                            Director Lonni Granlund - Yes
                                            Director Chris Mann - Yes

                                            Director Joyce McIntire - Yes
                                     Director  Joyce  McIntire  moved  to  adopt  Resolution  No.  2019-09  as
                                     presented.  Director Jay Bogh seconded the motion.
                                     The motion was approved by the following vote:
                                            Director Jay Bogh - Yes

                                            Director Bruce Granlund - Absent
                                            Director Lonni Granlund - Yes
                                            Director Chris Mann - Yes

                                            Director Joyce McIntire - Yes
               IV.     Operational Updates
                       A.     Status  Report  on  the  Annual  Repairs  and  Rehabilitation  of  the  Yucaipa  Valley
                              Regional Water Filtration Facility [Workshop Memorandum No. 19-054] - General
                              Manager  Joseph  Zoba  provided  an  update  on  the  status  of  the  annual
                              rehabilitation of the Yucaipa Valley Regional Water Filtration Facility.
                       B.     Overview of Performing a Root Cause Analysis to Study and Resolve Foaming
                              Issue at the Wochholz Regional Water Recycling Facility [Workshop Memorandum
                              No. 19-055] - General Manager Joseph Zoba and Operations Manager Charles
                              Thomas  provided  information  about  the  methodology  to  study  proposed
                              improvements at the Wochholz Regional Water Recycling Facility.
               V.      Capital Improvement Projects
                       A.     Overview of Change Order No. 1 and Notice of Completion for the Contract with
                              Borden Excavating for the Drinking Water Replacement Project in Oak Glen Road,
                              Citi-Bank  /  Yucaipa  Boulevard,  Douglas  Street,  Cornell  Drive,  Cornell  Court,
                              Cornell  Lane,  and  Auburn  Avenue  [Workshop  Memorandum  No.  19-056]  -
                              Implementation Manager Matthew Porras provided an overview of the Notice of
                              Completion and Change Order No. 1.
                       B.     Status  Report  on  the  Construction  of  an  8-Inch  Sewer  Mainline  in  Yucaipa
                              Boulevard  [Workshop  Memorandum  No.  19-057]  -  Implementation  Manager
                              Matthew  Porras  provided  an  overview  of  the  sewer  mainline  construction  in
                              Yucaipa Boulevard.
                       C.     Change Order No. 1 for the Contract with Weka Inc. for the Yucaipa Boulevard
                              Sewer  Main  Installation  Project  [Workshop  Memorandum  No.  19-058]  -
                              Implementation Manager Matthew Porras provided an overview of Change Order
                              No. 1 for the sewer mainline project in Yucaipa Boulevard.
                       D.     Status Report on the Infiltration Testing at the Calimesa Lake and Spreading Basin
                              Recharge  Facility  [Workshop  Memorandum  No.  19-059]  -  Implementation





               Yucaipa Valley Water District - Board Workshop Minutes                               Page 2 of 4
                                        Yucaipa Valley Water District - March 5, 2019 - Page 10 of 127