Workshop Memorandum 19-095



                Date:          April 9, 2019

                From:          Matthew Porras, Implementation Manager

                Subject:       Status Report on the Geotechnical Investigation in the Vicinity of the Calimesa
                               Lake and Recharge Facility

               As  a  part  of  the  Calimesa  Lakes  project,  the  District  has
               contracted  with  Geoscience  who  will  be  conducting recharge
               testing by discharging water into a constructed basin that will
               measure  300  feet  long  and  75  feet  wide.    The  testing  is
               scheduled to last 6-8 weeks and will utilize instrumentation that
               is  designed  to  accurately  measure  changes  in  moisture  and
               temperature at various depths in two separate locations.




































               At this point, both monitoring wells have been constructed and
               tested.    The  site  grading  is  complete,  the  basin  has  been
               constructed and the temporary supply line is installed.