Workshop Memorandum 19-094



                Date:          April 9, 2019

                From:          Matthew Porras, Implementation Manager

                Subject:       Overview of the Proposed Wildwood Canyon Road Sewer Mainline Replacement
                               Project

               The Yucaipa Valley Water District operates and maintains a gravity sewer mainline located south
               of Wildwood Canyon Road and west of the Wildwood Creek Basin.

               On February 18, 2019, the District staff identified a gravity sewer mainline (Asset #WW-PIP-0295)
               adjacent to Yucaipa Creek was damaged due to storm water that eroded the creek downstream
               of the Wildwood Canyon Stormwater Basins.  The erosion was so severe that the HDPE sewer
               mainline appeared to be dislodged by falling boulders that were originally located above the sewer
               mainline as part of the flood control project.










































               The sewer mainline was quickly repaired and is now temporarily suspended and restrained.  The
               bedding of the pipe needs to be re-established and fortified if the pipe remains in service.