Director Memorandum No. 19-067                                                       Page 2 of 8


               pipe will be removed from service but
               remain intact to allow for future use if
               necessary.     The  design  of  this
               segment  is  attached  and  will  bridge
               the  gap  between  two  existing
               segments  of  live  sewer  and  convey
               the  existing  flows  within  Wildwood
               Canyon Road.

               Project Timeline and Bid Process

               The urgency of this project has driven
               the   timeline   of   the   planning,
               engineering, and bid process.  In the
               effort  to  expedite  the realignment  of
               the  sewer  mainline  that  is  currently
               being suspended in the air above the
               Wildwood     Creek,    District   staff
               immediately     began      identifying
               possible solutions that would provide
               the most long-term protection of the
               sewer.

               The District’s engineer, Krieger and Stewart Engineering, designed the relocation of the sewer
               mainline within Wildwood Canyon Road and prepared the contract documents and specifications
               for the project.   After the design was completed, the two lowest bidders from recently Board
               awarded sewer Capital Improvement Projects were asked to meet onsite on May 24, 2019 to
               discuss the design and contract of the project.

               Weka  Inc.  and  Borden  Excavating  Inc.  received  a  copy  of  the  design  drawings,  contract
               documents and specifications in order to submit a competitive bid to the District.  The deadline
               for submitting a bid was updated in Addendum No. 1 (Attached) as June 4, 2019 at 2:00pm.  Only
               one of the two contractors submitted a bid before the deadline.  The results are provided below.


                                          Wildwood Sewer Project - Bid Results

                          Borden                                           $422,555



                       Weka Inc.    $0

                        Engineer
                        Estimate                                                                 $607,100


               Krieger  and  Stewart  will  be  providing  project  management  services  and  have  provided  the
               attached  bid  award  recommendation  letter.    This  project  is  categorically  exempt  from
               environmental  review  in  accordance  with  the  California  Environmental Quality  Act  Guidelines
               Section 15301(c).