Page 106 - _ 180314 Special Yucaipa GSA Packet
P. 106
Table 1 - 2012 Comparison of Corps and 401 Certification Notification Requirements for
Certified Nationwide Permits
NWP Nationwide Permit Description Corps 401 Certification
No. Pre-construction Notification
Notification (PCN) Requirements
Requirements
1 Aids to Navigation No PCN Required. No Notification Required.
Fish and Wildlife Harvesting,
4 Enhancement, and Attraction No PCN required. No Notification Required.
Devices and Activities
5 Scientific Measurement Devices No PCN required. Notification Required.
6 Survey Activities No PCN Required. Notification Required.
Structures in Fleeting and Anchorage
9 No PCN required. No Notification Required.
Areas
10 Mooring Buoys No PCN required. No Notification Required.
No PCN required
(except to reservoir
11 Temporary Recreational Structures Notification Required.
managers at Corps
Reservoirs).
PCN required under
12 Utility Line Activities Notification Required.
certain conditions.
Response Operations for Oil and
20 No PCN required. Notification Required.
Hazardous Substances
No PCN except for
historic structures
22 Removal of Vessels and operations in Notification Required.
Special Aquatic
Sites.
28 Modification of Existing Marinas No PCN required. Notification Required.
32 Completed Enforcement Actions No PCN Required. Notification Required.
36 Boat Ramps PCN Required. Notification Required.
5
Yucaipa Groundwater Sustainability Agency - March 14, 2018 - Page 102 of 226