Page 143 - Yucaipa Sustainable Groundwater Management Agency - Yucaipa SGMA
P. 143

3  Assumptions





            Dudek provides the following cost assumptions used in development of the fixed-price items outlined in the
            budget estimate.

            Assumptions for Development of GSP


            GSP Development


            Project Facilitation, Project Management, and Meetings
            Kickoff Meeting
            Dudek assumes that Valley District or the Yucaipa GSA will provide a single lead point of contact authorized to
            make decisions and provide project direction and project management upon Notice to Proceed. This person will
            assist with facilitating the kickoff meeting, which will be held at a location provided by Valley District. At this
            meeting it is assumed Valley District and the Yucaipa GSA member agencies will provide electronic copies, or links
            to electronic copies, of the sources with groundwater data listed in the RFP (e.g., USGS) and any additional
            sources that may have become available since the RFP was written.
            Monthly Yucaipa GSA Meetings
            We anticipate facilitating up to 36 monthly meetings, assuming 12 meetings per year, beginning in fall 2018 and
            ending in fall 2021. Each meeting is assumed to be three (3) hours long, and our cost estimate includes time for
            meeting preparation and travel. The meetings will be attended by the project manager or other major team
            member. Dudek assumes Valley District or Yucaipa GSA member agencies will reserve the meeting location.
            Technical Advisory Committee and Stakeholder Meetings
            We anticipate facilitating up to 13 TAC and stakeholder meetings, with four (4) occurring in 2019, four (4)
            occurring in 2020, and two (2) occurring in 2021. The cost estimate assumes the meetings will be three (3) hours
            long, and will be attended by the project manager and other team members pertinent to the meeting agenda, as
            well as our public outreach facilitator. Dudek assumes Valley District or Yucaipa GSA member agencies will
            reserve the meeting location and audiovisual equipment for the meetings.

            Weekly Project Phone Calls
            We have budgeted one (1) hour per week for the duration of the project for update phone calls. The phone calls
            will be conducted by either the project manager or other team members.

            Progress Reports and Schedule Updates
            Dudek will prepare monthly project reports and schedule updates that will identify the percentage of the budget
            by task that has been expended to date, the upcoming work and schedule, scope, or budget concerns identified
            during the billing period. Dudek anticipates preparing up to 36 monthly progress reports, beginning in fall 2018
            and ending in fall 2021. The progress report assumption is based on an anticipated 3-year contract.
            USGS Groundwater Model

            The costs for this task are based on using a calibrated numerical model that integrates surface water and
            recharge with groundwater. Dudek understands that the USGS anticipates having a calibrated model by the end
            of summer 2018, at which point the model input files and draft documentation on model design and calibration
            will be provided to Valley District. USGS anticipates publishing a final report of the model in the summer of 2019.


                                                                                                         Page C-5
                              Yucaipa Sustainable Groundwater Management Agency - August 9, 2018 - Page 141 of 208
   138   139   140   141   142   143   144   145   146   147   148