Page 6 - Yucaipa Sustainable Groundwater Management Agency - Yucaipa SGMA
P. 6

Lori Askew seconded the motion.

                              The motion was approved unanimously.

                              Aaron  Jones  indicated  that  he  would  discuss  this  issue  with  General  Manager
                              Doug Headrick of the San Bernardino Valley Municipal Water District.

                       B.     Status  Report  on  the  Yucaipa  Groundwater  Model  and  Related  Report  by  the
                              United States Geological Survey

                              Aaron  Jones  reported  that  the  United  States  Geological  Survey  has  made  the
                              preliminary model available to the San Bernardino Valley Municipal Water District.
                              The final deliverables to the San Bernardino Valley Municipal Water District will
                              include the integrated groundwater flow model, an accompanying report, and a
                              report  on  the  geologic  framework  of  the  study  area  and  are  scheduled  to  be
                              completed in June 2019.

                       C.     Status Report on the Infiltration Testing Study for the Yucaipa Basin

                              Aaron Jones distributed a schedule showing the current progress of the infiltration
                              testing by Todd Groundwater.  Aaron Jones stated that he would send preliminary
                              infiltration data for the study sites evaluated to date.

                              A draft report is scheduled to be provided during the week of October 15, 2018.
                              The draft report is expected to be included for review and discussion at the October
                              24, 2018 Yucaipa SGMA meeting.

                       D.     Status  Report  on  the  Preparation  of  a  Logo  and  Letterhead  for  the  Yucaipa
                              Sustainable Groundwater Management Agency

                              Lori Askew requested comments on the conceptual logo designs distributed at the
                              Yucaipa Sustainable Groundwater Management Agency meeting held on June 27,
                              2018.  Lori Askew requested this item be scheduled for further discussion at the
                              next meeting.

                       E.     Discussion Regarding an Invitation for Todd Groundwater to Explain their Bid on
                              GSP Management Services

                              David  Armstrong  discussed  the  concept  of  scheduling  a  meeting  with  Todd
                              Groundwater to explain their cost proposal in greater detail and deleting discussion
                              item V.F. from the meeting agenda.

                              After  a  discussion  about  this  issue,  David  Armstrong  moved  to  have  a
                              subcommittee of the Board of Directors meet with Todd Groundwater to discuss
                              their cost proposal.

                              Lori Askew seconded the motion.

                              After a lengthy discussion by the Board of Directors and other in attendance, David
                              Armstrong amended the motion to invite Todd Groundwater and Dudek back for
                              an additional interview with the Board of Directors.



                                                           Page 3 of 5
                              Yucaipa Sustainable Groundwater Management Agency - September 26, 2018 - Page 6 of 8
   1   2   3   4   5   6   7   8