P. 56

Infiltration Test Results















        A                                          B






                                                                                                              F



                                                                          A. Initial excavation of test infiltration basin
                                                                          B. Setting up flow control skid
                                                                          C. Temporary fencing and 4" fire hose from
                                                                               YVWD hydrant on 10th Street
        C                                          D                      D. Initial test basin filling (Day 1)
                                                                          E. Testing in progress (Day 2)
                                                                               Note abandoned pipes unearthed
                                                                               during excacation in background
                                                                          F. Test in progress view from north (Day 2)

                        Conclusions:
                        - Results of infiltration testing indicate that the site is suitable for recharge.
                        - Full-scale basin initial infiltration rates (based on 50% of measured field-scale testing infiltration
                        rates) are estimated at 6.4 feet/day.
                        - Long-term infiltration rates (based on 50% of full-scale basin initial infiltration rates) are estimated
                        at 3.2 feet/day.
                        - Relatively high infiltration rates are representative of the generally permeable vadose zone
        E               sediments (sand, gravel) encountered from 25 to 200 feet in adjacent exploratory boring EX-7
                        (located oustide of the channel south of Avenue E)
                        - Fine-grained silt/clay deposits encountered in the upper 25 feet of EX-7,  were not encountered
 Test Start  Jul-30-2018  during excavation. It is possible that upper clay deposits are only located outside of
                        the drainage channel.
 Test End  Aug-13-2018  - Depth to water in EX-7 was 115 ft-bgs in 2014, similar to water levels east of the fault,
 Basin Dimensions (L x W) (ft)  39 x 36  Chicken Hill Fault  indicating that the Chicken Hill Fault is a partial barrier to subsurface flow at this location.
 Average Water Height (ft)  2.1  - Due to its downgradient location in the Calimesa Basin, The value of this site for recharge is
                        contingent on potential benefits this site can provide to the Western Heights Subbasin.
 2
 Infiltrating Area Basin Bottom (ft )  960  - Water level differences of approximately 300 feet across the Chicken Hill Fault indicate
 2
 Infiltrating Area Basin Bottom + Walls (ft )  1,270  Hydrant  the that the hydraulic connection between the site and Western Heights Subbasin is
 Total Water Added (gallons)  1,451,335  10th Street and Avenue E  expected to be poor. However, further investigation and/or evaluation is needed
                        to confirm this interpretation.
 Total Water Added (acre-feet)  4.5  Chicken Hill Fault  Test Site
  High (ft/d)  13.44  " )  Recommendations:
 Infiltration Rate                - Pilot scale infiltration test with monitoring wells west/northwest of the Western Heights Fault
 Low (ft/d)  12.04  Boring
 (Constant-Head)   EX-7  would be needed to identify potential site vadose zone storage capacity constraints due to recharge
 Average (ft/d)  12.7  X Y  mounding and to confirm if recharge can benefit the Western Heights Subbasin.
 Infiltration Rate                    High (ft/d)  11.54  Chicken Hill Fault
 (Falling-Head)   Low (ft/d)  9.75  ยด                                                            Figure 5
 Full-Scale Basin Est. Initial Infiltration Rate (ft/d)  6.4  0  400 Feet                       10th Street
 Full-Scale Basin Est. Long-Term Infiltration Rate (ft/d)  3.2                                and Avenue E

 Yucaipa Sustainable Groundwater Management Agency - January 23, 2019 - Page 49 of 137