Page 60 - Yucaipa Sustainable Groundwater Management Agency - Yucaipa SGMA
P. 60

Infiltration Test Results














        A                                         B

                                                                                                 E
















        C


                                                                                                 F



                    DRY SOIL (SILT)                      A. Initial excavation of test infiltration basin
                10-12 FEET BELOW                         B. 4" fire hose through intra-basin culvert
                                                         C. Clay on basin surface from historical SWP recharge
        C       CHANNEL BOTTOM                    D           operations; SWP water during test release from turnout
                                                         D. Fine-grained silt/clay 0-2.5 feet; silt/sand/gravel 2.5-5 feet)
                                                         E. Test in progress (Day 11)
                                                         F. Dry basin after falling-head test (Day 14)


                       Conclusions:
 Test Start  Aug-13-2018  - Results of infiltration testing confirm that the site is suitable for recharge.
 Test End  Aug-27-2018  - Full-scale basin initial infiltration rates (based on 50% of measured field-scale testing infiltration
 Basin Dimensions (L x W) (ft)  32 x 29  rates) are estimated at 3.7 feet/day. Long-term infiltration rates (based on 50% of full-scale basin initial
 Average Water Height (ft)  3.0  Chicken Hill Fault  YVWD  infiltration rates) are estimated at 1.8 feet/day.
                       - While long-term estimates consider expected clogging of the basin bottom from SWP water,
           Hydrant
 2
 Infiltrating Area Basin Bottom (ft )  960  actual long-term rates will be dependent on the specific site recharge goal and implementation
 2
 Infiltrating Area Basin Bottom + Walls (ft )  1,270  of a basin maintenance plan.
                       - Declining infiltration rates during the test are associated with shallow recharge mounding
 Total Water Added (gallons)  882,120  Wilson Creek Basins  identified by the USGS (Mooreland, 1970)
 Total Water Added (acre-feet)  2.7  Test Site
  High (ft/d)  8.71  " )  Recommendations:
 Infiltration Rate                - If site recharge goals are expected to exceed the operational capacity of the basins,
 Low (ft/d)  6.05      the removal of the approximately upper 3 feet of sediment in each of the basins is
 (Constant-Head)
 Average (ft/d)  7.4   recommended prior to future active recharge. Pilot-scale testing is not recommended at this site.
 Infiltration Rate                    High (ft/d)  7.39
 (Falling-Head)   Low (ft/d)  5.51  X Y Exploratory Boring EX-1  ยด  0  400 Feet                  Figure 7
 Full-Scale Basin Est. Initial Infiltration Rate (ft/d)  3.7  Piezometer PZ1                  Wilson Creek
 Full-Scale Basin Est. Long-Term Infiltration Rate (ft/d)  1.8                                    Basins

 Yucaipa Sustainable Groundwater Management Agency - January 23, 2019 - Page 51 of 137