Page 65 - Beaumont Basin Watermaster - 2015 Annual Report
P. 65
813.8 687.4
- 4,278.7 5,042.3 4,980.4 6,305.8 8,287.3 10,621.0 10,810.2 9,484.8 5,029.5 3,476.2 69,817.4
Total
813.8 687.4 777.7 541.3 823.4 881.8 16.5 9.2
- 1,047.4 1,222.3 1,842.0 1,827.2 10,490.0
SGPWA 3
Supplemental Recharge (ac-ft) BCVWD 1 - - - 3,501.0 4,501.0 2,399.0 2,741.2 5,727.0 7,979.0 7,783.0 7,403.0 4,405.0 2,773.0 49,212.2
Table 3-4 Annual Supplemental Recharge to the Beaumont Basin -- Calendar Year Accounting Beaumont 2 - - - - - - - - - - - - - -
- - - - - 1,534.0 2,741.2 1,338.0 800.0 1,200.0 1,200.0 608.0 694.0 10,115.2
Banning 1 3.- SWP water recharged in the Pass Agency's Little San Gorgonio Creek Spreading Ponds
Year 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Totals 1.- SWP water recharged in the BCVWD Noble Creek Recharge Facility of the estimated amount of recharge in the Beaumont Basin is pending.