Page 8 - Yucaipa Valley Water District
P. 8

MINUTES OF A BOARD WORKSHOP

                                             March 26, 2019 at 4:00 P.M.


                Directors Present:                     Staff Present:
                  Bruce Granlund, Vice President         Chelsie Fogus, Engineering Technician I
                   Lonni Granlund, Director              Ashley Gibson, Regulatory Compliance Manager
                   Joyce McIntire, Director              Dustin Hochreiter, Senior Engineering Technician
                                                         Mike Kostelecky, Operations Manager
                                                         Matthew Porras, Implementation Manager
                                                         Mike Rivera, Public Works Supervisor
                                                         John Wrobel, Public Works Manager
                                                         Joseph Zoba, General Manager

                Directors Absent:                      Consulting Staff Present:
                  Chris Mann, President                  David Wysocki, Legal Counsel
                   Jay Bogh, Director

                Guests and Others Present:
                  Linda Shelton
                   Claire Marie Teeters
                   Gil Navarro, San Bernardino Valley Municipal Water District
                   David Castaldo, San Gorgonio Pass Water Agency


               I.      Call to Order - 4:00 p.m. - The workshop of the Board of Directors of the Yucaipa Valley
                       Water District was called to order by Bruce Granlund at 4:00 p.m. at the Administrative
                       Office Building, 12770 Second Street, Yucaipa, California.
               II.     Public Comments - None
               III.    Staff Report - General Manager Joseph Zoba reported on  the following items: (1) the
                       Yucaipa Sustainable Groundwater Management Agency will be meeting on March 27,
                       2019 at 10:00 am; (2) the Beaumont Basin Watermaster will be meeting on March 27,
                       2019 at 10:00 am; (3) the San Gorgonio Pass Water Alliance will be meeting on March
                       27,  2019  at  5:00  pm;  (4)  the  District  received  a  proposed  from  Dudek  regarding  the
                       preparation of a biological model at the Wochholz Regional Water Recycling Facility; and
                       Implementation Manager Matthew Porras reported on the status of the Singleton Road
                       Pipeline Project.

               IV.     Presentation
                       A.     Overview of the 2019 WateReuse Conference [Workshop Memorandum No. 19-
                              084]  -  Implementation  Manager  Matthew  Porras  reported  on  the  WateReuse
                              Conference and shared information from the various presentations.
               V.      Capital Improvement Projects
                       A.     Status  Report  on  the  Construction  of  an  8-Inch  Sewer  Mainline  in  Yucaipa
                              Boulevard,  Yucaipa  [Workshop  Memorandum  No.  19-085]  -  Implementation
                              Manager  Matthew  Porras  provided  information  about  the  Yucaipa  Boulevard
                              Sewer Project.




               Yucaipa Valley Water District - Board Workshop Minutes                               Page 1 of 2
                                         Beaumont Basin Watermaster - April 2, 2019 - Page 8 of 35
   3   4   5   6   7   8   9   10   11   12   13