Page 9 - Yucaipa Valley Water District
P. 9

B.     Status Report on the Geotechnical Investigation in the Vicinity of the Calimesa
                              Lake  and  Recharge  Facility  [Workshop  Memorandum  No.  19-086]  -
                              Implementation  Manager  Matthew  Porras  provided  information  about  the
                              Calimesa Lake and Recharge Facility.
                       C.     Overview of the Proposed Roadway Improvements to Marondi Drive, Calimesa
                              [Workshop  Memorandum  No.  19-087]  -  Public  Works  Manager  John  Wrobel
                              provided an overview of the paving bids received for the Oak Hills area.
                       D.     Discussion  Regarding  the  Wildwood  Canyon  Road  Sewer  Mainline  Extension
                              [Workshop Memorandum No. 19-088] - Implementation Manager Matthew Porras
                              provided information about the relocation of the sewer mainline from Wildwood
                              Creek.
                       E.     Overview  of  the  Fremont  Street  Water  System  Bypass  for  the  Construction  of
                              Flood Control Facilities [Workshop Memorandum No. 19-089] - Senior Engineering
                              Technician Dustin Hochreiter provided information about the pipeline relocation
                              project for the Fremont Street Bridge Project.
                       F.     Overview of Proposed Projects for the Fiscal Year 2019-20 Capital Improvement
                              Program [Workshop Memorandum No. 19-090] - General Manager Joseph Zoba
                              provided information about the proposed Capital Improvement Projects for Fiscal
                              Year 2019-20.
               VI.     Administrative Issues
                       A.     Overview of Suggested Updates to the District’s Standard Design Drawings and
                              Specifications  [Workshop  Memorandum  No.  19-091]  -  Senior  Engineering
                              Technician Dustin Hochreiter provided an overview of the proposed changes to
                              the District’s standard drawings.
               VII.    Director Comments - Director Joyce McIntire stated that she received kind remarks from
                       South Mesa Mutual Water Company for the work completed by District staff in 7  Place.
                                                                                                    th
               VIII.   Announcements - The future meetings were referenced on the workshop agenda.
               IX.     Closed Session - None
               X.      Adjournment - The meeting was adjourned at 5:10 p.m.

                                                                   Respectfully submitted,



                                                                           Joseph B. Zoba, Secretary






















               Yucaipa Valley Water District - Board Workshop Minutes                               Page 2 of 2
                                         Beaumont Basin Watermaster - April 2, 2019 - Page 9 of 35
   4   5   6   7   8   9   10   11   12   13   14