Page 211 - _ 180314 Special Yucaipa GSA Packet
P. 211

Drewelow Remediation Equipment, Inc.
                   A Minority Woman Owned, Certified Small Business Since 1993


                   David S. Drewelow
                   1523 Sterling Court
                   Encinitas, CA  92024
                   Phone:  760-546-6456
                   Fax:  760-546-6476
                   Mobile: (760) 715-8912
                   Email:  david@dre-equip.com
                   www.dre-equip.com

                   Vice President/Petroleum Engineer – Drewelow Remediation Equipment, Inc – Escondido, CA –
                   10/93 to present
                   Provide engineering and contracting service for the selection, installation, startup, routine O&M, trouble
                   shooting and repair of vapor extraction and groundwater treatment equipment.  Supply rental thermal
                   oxidizers, rental blower packages, rental pump and treat equipment and activated carbon equipment.
                   Supply new remediation equipment.  Performed routine O&M at remediation sites throughout Southern
                   California for commercial, industrial and Department of Defense projects.  Have made hundreds of site
                   visits to trouble shoot and repair remediation equipment.  Extensive experiences in the use of electrical test
                   equipment to trouble shoot and repair complicated motor control circuits, temperature feedback circuits, 0 –
                   5 volts circuits, 4 – 20 ma circuits and 120-volt control circuits.  Supply and install blowers, motors,
                   pumps, temperature sensors and switches, pressure sensors and switches, 4 – 20 ma valve actuators, motor
                   starters, etc.  Design and manufacture blower packages and gas / liquid separators, water systems with high
                   level alarms, pump down or pump up operations and remote telemetry systems.

                   Senior Engineer – Vapor Extraction Technology – San Clemente, CA – 9/92 to 9/93
                   Responsible for the design, installation, operation, maintenence and monitoring of vapor extraction systems
                   (VES).  Installed thirteen VES’s of various types in 1993.  Managed the operation and monitoring of
                   seventeen sites throughout Southern California, resulting in two site closures and significant reductions of
                   soil and groundwater contamination at the remaining sites.  Developed a maintenence program for
                   remediation equipment, which resulted in a marked increase in equipment reliability and uptime.  Carried
                   out all major modification and repairs to remediation equipment.  Highly skilled in VES optimization to
                   reduce cleanup time and to cut utility cost.  Designed and manufacture vapor extraction equipment.

                   Hydrogeologist / Engineer – Hargis + Associates – La Jolla, CA – 8/91 to 8/92
                   Responsible for the operation, maintenance and monitoring of an electrical oxidizers and free product
                   removal system.  Developed standard operating procedures (SOP) to ensure accurate and repeatable
                   monitoring, data collection and equipment maintenence.  Trained staff in SOP’s.  Wrote quarterly progress
                   reports for remediation projects.  Wrote phase 1, phase 2 and remedial action reports.  Supervised the
                   drilling and installation of monitoring wells, soil borings and vapor extraction wells.  Collected soil
                   samples and groundwater samples and completed COC’s.  Created water level contour maps, lithology
                   logs, geologic cross sections and iso contour maps.

                   Driller – Layne Environment – Long Beach, CA – 9/89 to 7/91
                   Operated mud rotary, air rotary, casing hammer and hollow stem auger drilling equipment.  Drilled and
                   completed wells for environmental, geotechnical and water supply projects.  Operated soil-sampling
                   equipment (SPT, split spoon and Shelby tubes).  Installed drilled and complete over 500 wells.


                   Education / Licenses / Certificates
                   BS Petroleum Engineering, University of Texas at Austin, 1987
                   8 Hour OSHA supervisor training, 1994
                   40 Hour OSHA training per 29 CFR 1910.120/T8 CCR 5192, 1991 last update June 1999
                   California Contractors License D21 – Machinery and pumps, 1996







                                  Yucaipa Groundwater Sustainability Agency - March 14, 2018 - Page 186 of 226
   206   207   208   209   210   211   212   213   214   215   216