Page 228 - _ 180314 Special Yucaipa GSA Packet
P. 228
Sub‐
GEOSCIENCE Support Services, Inc.
Cost Proposal for Professional Hydrogeological Services Related to the Yucaipa Basin Recharge Study
Alternative A: Excavated Basins
Senior TOTAL PROJECT Total Contractor Reimbursable Staff Project COST GEOSCIENCE Labor Cost Total Hours Clerical CAD/GIS Cost 2 Geohydrologist Geohydrologist Geohydrologist Expenses 1 Cost $95 $110 $125 $165 $205 2,650 $ 2,650 $ 2,650 $ 14 10 4,760 $ 4,760 $ 4,760 $ 32 16 8 12,360 $ 12,360 $ 12,360 $ 94 40 32 16 4 6,020 $ 6,020 $ 6,020 $
Proposal for Consulting Services for Infiltration Testing Implementation for Thirteen Sites in Yucaipa Basin Area ‐ Yucaipa Basin Recharge Study
Principal Engineer/Geoh ydrologist $250 4 8 2 4 32 50 16 4 4 24 74 Units Hrs. Ea. Ea. Ea. Hrs. Units Ea. ‐ Ea. Ea. Ea. Ea. Months Months Week
Hourly Rate: Task 1.0 Subtotal Task 2.0 Subtotal TOTAL HOURS AND COST: (i) Mobilize equipment to site; (ii) excavate 30' x 30' x 5' test pit with 1:1 sloped walls and place loose material in temporary locations with BMP measures as required by permits; (iii) install water supply piping, inlet manifold and instrumentation; Total Cost Per Site powered magnetic flow meters with totalizer and local display; (ii) line pressure transmitter; (iii) ultrasonic level indicator; (iv) pressure regulator and isolation valves and manifold; (v) telemetry programming that sends
San Bernardino Valley Municipal Water District
Develop Project Work Plan Project Kickoff Meeting and Site Reconnaissance Finalize Facilities Design and Develop Process and Instrumentation Diagram Develop Detailed Site Plan for 13 Sites Progress Meeting and Finalization of Work Plan Project Management and Permit Support Infiltration Testing at 13 Sites Fabrication of Needed Equipment Conduct Infiltration Testing at 13 Sites Data Downloads and Testing Oversight Data Compilation, Analysis, and Reporting Reimbursable expenses include mileage and report reproduction. Subcontractor Costs for IO Environmental & Infrastructure,
Description 1.1 1.2 1.3 1.4 1.5 2.1 2.2 2.3 2.4 Item No. 1 2 3 4 5 Item No. 1 2 3 4 5 6 7 8
1 2
Task 1.0 2.0 17‐Jan‐18