                    Cost Proposal for Professional Hydrogeological Services Related to the Yucaipa Basin Recharge Study
                       Alternative B: Containerized Infiltrometer
                                Senior   TOTAL    Total  Contractor  Reimbursable  Staff  Project  PROJECT COST  GEOSCIENCE   Labor Cost  Total Hours Clerical Graphics  Cost  2 Geohydrologist Geohydrologist Geohydrologist Expenses  1  Cost   $95  $110  $125  $165  $205  2,650 $                    2,650 $                 2,650 $                 14  10  4,760 $                     4,760 $                  4,760 $                 32  16  8  12,360 $                 12,360 $               12,360 $               94  40  32  16  4  6,020 $                     6,020 $                  6,020 $                 40  8  16  8  4
            Proposal for Consulting Services for Infiltration Testing Implementation for Thirteen Sites in Yucaipa Basin Area ‐ Yucaipa Basin Recharge Study



                                Principal   Hydrologist  $250  4  8  2  4  32  50  16  4  4  24  74  Units  Hrs.  Ea.  Ea.  Ea.  Hrs.  Units  Ea.  ‐  Ea.  Ea.  Ea.  Months  Week







                                      Hourly Rate:       Task 1.0 Subtotal  Task 2.0 Subtotal TOTAL HOURS AND COST:      (i) Mobilize equipment including 3 containers to site; (ii) trench for three (3) container skirts and place three (3) container   Total Cost Per Site (Assumes 1 Container) Provide three (3) 40 ft x 8 ft shipping containers modified for infiltration testing and equipped with water inlet, instrumentat Provide cellular SCADA RTU for collecting flow, pressure and level data: NEMA enclosure‐‐includes 1‐year subscription for   Total Equipment Cost

























































          San Bernardino Valley Municipal Water District







                                         Develop Project Work Plan Project Kickoff Meeting and Site Reconnaissance Finalize Facilities Design and Develop Process and Instrumentation Diagram  Develop Detailed Site Plan for 13 Sites Progress Meeting and Finalization of Work Plan Project Management and Permit Support  Infiltration Testing at 13 Sites Fabrication of Needed Equipment Conduct Infiltration Testing at 13 Sites Data Downloads and Testing Oversight Data Compilation, Analysis, and Reporting Reimbursable expenses include mileage and report reproduction. Subcontractor Costs for IO Environmental & Infrastructure,








                                 Description  1.1  1.2  1.3  1.4  1.5  2.1  2.2  2.3  2.4  Item No.  1  2  3  4  5  Item No.  1  2  3  4  5  6






                                                                               1  2
                                 Task    1.0                2.0
                                                                                                                                                      17‐Jan‐18