San Bernardino Valley Municipal Water District                                                         Table 1b
 Proposal for Consulting Services for Infiltration Testing Implementation for Thirteen Sites in Yucaipa Basin Area - Yucaipa Basin Recharge Study







 Cost Proposal for Professional Hydrogeological Services Related to the Yucaipa Basin Recharge Study
 Alternative B: Containerized Infiltrometer

                    GEOSCIENCE Support Services, Inc.
                                                                                       Sub-      TOTAL
 Principal                                                     Reimbursable   Total   Contractor   PROJECT
 Task  Description  Engineer/Geo-  Senior   Project   Staff   CAD/GIS  Clerical  Total Hours   Labor Cost   GEOSCIENCE   2
 Geohydrologist Geohydrologist Geohydrologist                   Expenses   1          Cost       COST
 hydrologist                                                                 Cost
 Hourly Rate:  $250  $205  $165  $125  $110  $95
 1.0  Develop Project Work Plan
 1.1  Project Kickoff Meeting and Site Reconnaissance  4  10  14  $             2,650   $              2,650   $                  2,650
 1.2  Finalize Facilities Design and Develop Process and Instrumentation Diagram   8  8  16  32  $             4,760   $              4,760   $                  4,760
 1.3  Develop Detailed Site Plan for 13 Sites  2  4  16  32  40  94  $           12,360   $            12,360  $                12,360
 1.4  Progress Meeting and Finalization of Work Plan  4  4  8  16  8  40  $             6,020   $              6,020   $                  6,020
 1.5  Project Management and Permit Support  32  12  40  28  112  $           20,560   $            20,560  $                20,560
 Task 1.0 Subtotal  50  20  74  84  64  0     292    $           46,350   $                      -   $            46,350  $                           -   $                46,350
 2.0  Infiltration Testing at 13 Sites
 2.1  Fabrication of Needed Equipment  16  8   24    $             5,000   $              5,000   $              147,421  $              152,421
 2.2  Conduct Infiltration Testing at 13 Sites  8  16  100  124  $           16,780   $              1,950  $            18,730  $              142,207  $              160,937
 2.3  Data Downloads and Testing Oversight  4  4  16  52  76  $           10,960   $            10,960  $                10,960
 2.4  Data Compilation, Analysis, and Reporting  4  6  16  50  16  4  96  $           13,260   $                 500  $            13,760  $                13,760
 Task 2.0 Subtotal  24  18  48  210  16  4    320    $           46,000   $              2,450  $            48,450  $              289,628  $              338,078
 TOTAL HOURS AND COST:       74  38  122  294  80  4  612  $           92,350   $              2,450  $            94,800  $       289,628  $       384,428
 1  Reimbursable expenses include mileage and report reproduction.
 2
 Subcontractor Costs for IO Environmental & Infrastructure, Inc.:
 Subcontractor Cost Summary: Conduct Testing at 13 Sites with two sites simultaneously (Alternative B - Containerized Infiltrometer)
 Item   Description  Units  Qty.  Unit Costs  Extended Cost
 No.
 1  Contractor site reconnaissance survey   Hrs.  6   $                 115   $                 690
 (i) Mobilize equipment including 4 containers to site; (ii) trench for four (4) container skirts and place four (4) container
 2  with crane or forklift; (iii) install water supply piping, inlet manifold and instrumentation; (iv) install traffic control   Ea.  1   $              5,480   $              5,480
 measures; (v) provide equipment check, startup and begin basin filling
 3  Fencing Subcontractor to install and remove fence at site  Ea.  1  $                  550    $                 550
 4  (i) Demobilize equipment at site; (ii) restore ground in vicinity of container  Ea.  1   $              3,529   $              3,529
 5  Allowance for one contractor site visits during 2-week test   Hrs.  6  $                  115    $                 690
 Total Cost Per Site (Assumes 2 Containers per Site)   $            10,939
 Subcontractor Materials and Equipment Cost Summary (Alternative B - Containerized Infiltrometer)
 Item No.Description  Units  Qty.  Unit Costs  Extended Cost
 1  Totalizing flow meter installed at Hydrant  Ea.  -   By Utility
 2  Site water conveyance equipment: 1000 ft of  3" temporary hose/pipe  and misc. valves and fittings  Ea.  2   $              9,625   $            19,250

 Provide four (4) 40 ft x 8 ft shipping containers modified for infiltration testing and equipped with water inlet,
 instrumentation, control and remote data collection system that includes: (i) Inlet piping and float-actuated control
 3  valve; (ii)high-flow and low-flow battery powered magnetic flow meters with totalizer and local display; (iii) line   Ea.  4  $             28,600  $          114,400
 pressure transmitter; (iv) ultrasonic level indicator; (v) pressure regulator and isolation valves and manifold; (vi)
 telemetry programming that sends text alert based on low line pressure or high-water level in basin

 Provide cellular SCADA RTU for collecting flow, pressure and level data: NEMA enclosure--includes 1-year subscription
 4  Ea.  4   $              2,900   $            11,600
 for web-hosted data collection and download interface
 5  Rental of Traffic control signage and water line crossing ramps for vehicle access and outhouse facilities  Months  6  $                  362    $              2,171
 6  Rental of temporary 21,000 gal water supply tank (OPTIONAL)  Week  -  $               1,200   -
 Total Equipment Cost   $          147,421















  9-Feb-18  Page 1 of 1                                                   GEOSCIENCE Support Services, Inc.







 Yucaipa Groundwater Sustainability Agency - March 14, 2018 - Page 225 of 226
   250   251   252   253   254   255   256   257