Page 252 - _ 180314 Special Yucaipa GSA Packet
P. 252

Table 1a
                    Cost Proposal for Professional Hydrogeological Services Related to the Yucaipa Basin Recharge Study
                           GEOSCIENCE Support Services, Inc.
                       Alternative A: Excavated Basins
                                   Geohydrologist  $205  4  4  12  20  8  4  6  18           6
                                 Senior   TOTAL PROJECT  Sub‐Contractor    Total  Reimbursable  Staff  Project   COST  Cost  2 GEOSCIENCE   Labor Cost  Total Hours Clerical Graphics Expenses  1 Geohydrologist Geohydrologist  Cost   $95  $110  $125  $165  2,650 $                        2,650 $               2,650 $                14  10  4,760 $                        4,760 $               4,760 $                32  16  8  12,360 $                      12,360 $             12,360 $             94  40  32  16  6,020 $                        6,020 $               6,020 $                40  8  16  8  22,710 $
            Proposal for Consulting Services for Infiltration Testing Implementation for Thirteen Sites in Yucaipa Basin Area ‐ Yucaipa Basin Recharge Study





                                 Senior   Engineer  $250  4  8  2  4  32  50  16  4  4  24  74  Units  Hrs.  Ea.  Ea.  Ea.  Hrs.  Units  Ea.  ‐  Ea.  Ea.  Ea.  Ea.  Months  Months  Week






                                        Hourly Rate:     Task 1.0 Subtotal  Task 2.0 Subtotal TOTAL HOURS AND COST:       Total Cost Per Site battery powered magnetic flow meters with totalizer and local display; (ii) line pressure transmitter; (iii) ultrasonic level  Provide cellular SCADA RTU for collecting flow, pressure and level data: NEMA enclosure‐‐includes 1‐year subscription   Total Equipment Cost























































          San Bernardino Valley Municipal Water District



                                          Develop Project Work Plan Project Kickoff Meeting and Site Reconnaissance Finalize Facilities Design and Develop Process and Instrumentation Diagram  Develop Detailed Site Plan for 13 Sites Progress Meeting and Finalization of Work Plan Project Management and Permit Support  Infiltration Testing at 13 Sites Fabrication of Needed Equipment Conduct Infiltration Testing at 13 Sites Data Downloads and Testing Oversight Data Compilation, Analysis, and Reporting Reimbursable expenses include mileage and report reproduction. Subconsultant Costs for IO Environmental & Infrastructure,







                                  Description  1.1  1.2  1.3  1.4  1.5  2.1  2.2  2.3  2.4   1    2    3  4  5           1  2  3   4    5  6  7  8






                                                                               1  2
                                  Task    1.0               2.0




                                                                                                                                                      9‐Feb‐18
   247   248   249   250   251   252   253   254   255   256   257