Table 1a
Cost Proposal for Professional Hydrogeological Services Related to the Yucaipa Basin Recharge Study
GEOSCIENCE Support Services, Inc.
Alternative A: Excavated Basins
Geohydrologist $205 4 4 12 20 8 4 6 18 6
Senior TOTAL PROJECT Sub‐Contractor Total Reimbursable Staff Project COST Cost 2 GEOSCIENCE Labor Cost Total Hours Clerical Graphics Expenses 1 Geohydrologist Geohydrologist Cost $95 $110 $125 $165 2,650 $ 2,650 $ 2,650 $ 14 10 4,760 $ 4,760 $ 4,760 $ 32 16 8 12,360 $ 12,360 $ 12,360 $ 94 40 32 16 6,020 $ 6,020 $ 6,020 $ 40 8 16 8 22,710 $
Proposal for Consulting Services for Infiltration Testing Implementation for Thirteen Sites in Yucaipa Basin Area ‐ Yucaipa Basin Recharge Study
Senior Engineer $250 4 8 2 4 32 50 16 4 4 24 74 Units Hrs. Ea. Ea. Ea. Hrs. Units Ea. ‐ Ea. Ea. Ea. Ea. Months Months Week
Hourly Rate: Task 1.0 Subtotal Task 2.0 Subtotal TOTAL HOURS AND COST: Total Cost Per Site battery powered magnetic flow meters with totalizer and local display; (ii) line pressure transmitter; (iii) ultrasonic level Provide cellular SCADA RTU for collecting flow, pressure and level data: NEMA enclosure‐‐includes 1‐year subscription Total Equipment Cost
San Bernardino Valley Municipal Water District
Develop Project Work Plan Project Kickoff Meeting and Site Reconnaissance Finalize Facilities Design and Develop Process and Instrumentation Diagram Develop Detailed Site Plan for 13 Sites Progress Meeting and Finalization of Work Plan Project Management and Permit Support Infiltration Testing at 13 Sites Fabrication of Needed Equipment Conduct Infiltration Testing at 13 Sites Data Downloads and Testing Oversight Data Compilation, Analysis, and Reporting Reimbursable expenses include mileage and report reproduction. Subconsultant Costs for IO Environmental & Infrastructure,
Description 1.1 1.2 1.3 1.4 1.5 2.1 2.2 2.3 2.4 1 2 3 4 5 1 2 3 4 5 6 7 8
1 2
Task 1.0 2.0
9‐Feb‐18