John Gonzales
                           Site Superintendent (IO Environmental)

                                                               and root balls, constructing a soil treatment pad, excavating
                                                               and staging 6,000 CY of contaminated soil, performing a
                           Years of Experience: 21             pilot study using innovative VEG methods, and transporting
                                                               and disposing 5,770 CY of soil as Cal-hazardous waste.
                         Years with Current Firm: 2
                                                               TOR Metro, San Diego, CA
               Registration:                                   John oversaw efforts to install and fill 102 chimney
               California State Contractor’s License C-21      boreholes with graphite. He also oversaw installation of 102
                                                               pairs of sheet pile that were embedded to a depth of 46
               Excavation 49 CFR192 Subpart N/195 Subpart G    feet below ground surface. John provided health and safety
                                                               oversight confirming that all workers were appropriately
               Competent Person Certified – Frame System,      trained and that work was conducted according to the
               Trenching and Excavation                        project Health and Safety Plan. He oversaw site preparation
                                                               activities, conducted subsurface utility clearance,
               Status:                                         completed entry pit excavation, conducted trenching,
               Full-time employee                              segregation, and disposal of excavated materials. John also
                                                               constructed security fencing, parking and a staging area to
                                                               safely store materials, staged lighting for night operations,
                                                               and coordinated work crews.
                What John brings to the project...
                                                               Tesoro Vinvale Terminal Facility (Former BP Facility), Long
          •  Experience managing complex construction          Beach, CA
              projects involving environmental compliance,     Since October of 2015, IOEI has installed More than
              regulatory agency oversight, and multiple field   1700 linear feet of above ground 2” to 8” steel welded
              sites—help obtain accurate data and meet         conveyance piping and more than 2000 liner feet of below
              permitting requirements                          ground 2” to 6” diameter PVC piping . They also installed
                                                               more than 8000 linear feet of 1” to 1.5 inch sPVC air sparge
                                                               piping. As the Site Superintendent, John supervised the
        John has more than 20 years of professional experience   installation of more than 21 well boxes ranging from 24” to
        managing complex construction operations for a range of   48”. Our team modified the natural gas service and installed
        military, municipal and commercial clients. His experience   new pressure regulators and seismic valves for new FlamOx
        includes project scheduling, budget tracking, subcontractor   2 and FlamOx 4 Catalyic Oxidizers.
        management, and equipment operation and maintenance.
        He has managed numerous excavation and earthwork       The construction effort included saw cutting more than
        projects in Southern California, and is familiar with   7000 liner feet of 4” to 14” thick asphalt, removing more
        applicable permitting, regulations, and safety requirements.  than 500 tons of asphalt, and hand excavating more than
        His experience on environmental remediation projects   500 cubic yards of impacted soil.
        gives him and in-depth understanding of monitoring
        equipment installation and its impact on accurate      Airport Storm Channel Access Road, Orange County Flood
        data collection. Additionally, John is certified for heavy   Control District
        equipment operation including backhoe, loader, excavator,   John oversaw construction efforts to improve the access
        forklift, and aerial lift.                             road and airport storm channel for the Orange County
                                                               Flood Control District. This project required site work,
        Selected Project Experience                            installing temporary fencing and temporary gates, transition
                                                               railing, concrete barriers, and decomposed granite
        Pilot Study of Organochlorine-Contaminated Soil, Marine  according to approved project plans and specifications.
        Corps Base Camp Pendleton
        John served as Site Superintendent on a pilot study to
        evaluate innovative remediation alternatives to treat                   Experience with Complex Projects
        OCP-contaminated soil. This work was conducted as part
        of a federal facilities agreement (FFA) with oversight from             Environmental remediation projects often
                                                                                involve very precise grading requirements
        regulatory agencies including US Environmental Protection               and complex instrumentation. John’s
        Agency, California Department of Toxic Substances Control,              experience is ideal for this project since
        California Regional Water Quality Control Board San Diego               his attention to detail and experience with
        Region, California Air Resources Board, and San Diego                   instrumentation will help our team obtain
        County Department of Environmental Health.                              accurate and reliable data—helping to
                                                                                provide recommendations that accurately
        This project required felling and chipping more than 1,500              reflect geological conditions
        mature eucalyptus trees, removing and chipping stumps