Infiltration Test Results















        A                                          B






                                                                                                              E





                                                              A. Traffic control and buried hose from SMWC hydrant
                                                              B. Testing in progress (Day 1)
                                                              C. EX-4 monitoring well (151' deep)
                                                   D               located ~100' east of test basin
                                                              D. Flow control skid at end of test (Day 14)
                                                              E. Test in progress view from east (Day 7)










        C
                       Conclusions:
                       - Results of infiltration testing indicate that the site is suitable for recharge.
                       - Full-scale basin initial infiltration rates (based on 50% of measured field-scale testing infiltration
                       rates) are estimated at 19.5 feet/day.
                       - Long-term infiltration rates (based on 50% of full-scale basin initial infiltration rates) are estimated
                       at 9.8 feet/day.
 Test Start  Sep-10-2018  - Relatively high infiltration rates are representative of the permeable vadose zone sediments
                       (sand, gravel) encountered in adjacent exploratory boring EX-4
 Test End  Sep-24-2018
                       - No significant fine-grained silt/clay deposits were encountered in EX-4, which was drilled to
 Basin Dimensions (L x W) (ft)  29 x 28  Wildwood Creek Basin  151 feet-bgs. Depth to water in MW-3 was 103 ft-bgs after 6 days of testing and rose to
 Average Water Height (ft)  3.0  South Mesa Barrier  Test Site  within 99 ft-bgs at the end of testing (after 14 days of infiltration).
 2
 Infiltrating Area Basin Bottom (ft )  960  " )  X Y Boring EX-4  - While long-term estimates consider expected clogging of the basin bottom from SWP water,
                       actual long-term rates will be dependent on the specific site recharge goal and implementation
 2
 Infiltrating Area Basin Bottom + Walls (ft )  1,270  Peizometer PZ-3  of a basin maintenance plan.
 Total Water Added (gallons)  4,040,929
                       Recommendations:
 Total Water Added (acre-feet)  12.4
                       - Pilot scale infiltration test is recommended to identify potential site vadose zone storage capacity
  High (ft/d)  45.8    constraints due to recharge mounding and the influence of the South Mesa Barrier.
 Infiltration Rate
 Low (ft/d)  32.2      - Prior to pilot testing, installation of monitoring well west of the South Mesa Barrier is recommended
 (Constant-Head)       to confirm groundwater storage benefits from managed aquifer recharge at this location.
 Average (ft/d)  39.0
 Infiltration Rate                    High (ft/d)  31.2
 (Falling-Head)   Low (ft/d)  28.3  SMWC Hydrant  ยด  0  400 Feet                                 Figure 11
 Full-Scale Basin Est. Initial Infiltration Rate (ft/d)  19.5                                Wildwood Creek
 Full-Scale Basin Est. Long-Term Infiltration Rate (ft/d)  9.8                                     Basin