                                          YUCAIPA VALLEY WATER DISTRICT
                                          CAPITAL IMPROVEMENT PROGRAM


                 Project     AMI – Meter Replacement and Retrofit



                 Division    YVRWFF/Public Works                      Project Priority      2019/2022 - 1

                                                                      Projected Start
                Category     System Improvements
                                                                           Date


                  Phase          Planning             Design           Environmental         Construction


                  Notes


                                    COST BY TYPE                                FUNDING SOURCE
                  Preliminiary Engineering/Design              $ 0  Reserves/Depreciation               $ 0
                  Environmental                                $ 0  Development Impact Fees     $ 3,000,000
                  Right-of-Way/Land Acquisition                $ 0  Federal Participation       $ 1,000,000
                  Labor, Equipment, Administration      $ 4,000,000  State Participation
                  Contract Construction                        $ 0  Bond Financing
                  Construction Engineering                     $ 0  Local Matching
                  Other: Environmental/Permitting/Misc         $ 0  Other Funds                         $ 0

                                             Total      $ 4,000,000                   Total     $ 4,000,000


               Project Description:

               The District has approximately 6,000 AMI capable consumption meters of the almost 13,000 total
               consumption meters.  The 6,000 AMI capable meters must be retrofitted with a radio transceiver
               and special meter box lid.  The remaining 7,000 consumption meters will need to be replaced with
               AMI capable meters and receive the same radio and meter box lid as the retrofits.

               This project will be split up over the next three years.