P. 37
Workshop Memorandum No. 19-090 Page 6 of 19
YUCAIPA VALLEY WATER DISTRICT
CAPITAL IMPROVEMENT PROGRAM
Project Recycled Water – Calimesa Lake
Division Recycled Water Project Priority Important
Projected Start
Category Water Storage 2019-3
Date
Phase Planning Design Environmental Construction
Notes Cost Pending
COST BY TYPE FUNDING SOURCE
Preliminiary Engineering/Design $ 0 Reserves/Depreciation $ 6,000,000
Environmental $ 0 Development Impact Fees $ 0
Right-of-Way/Land Acquisition $ 0 Federal Participation $ 0
Labor, Equipment, Administration $ 0 State Participation $ 0
Contract Construction $ 6,000,000 Bond Financing $ 0
Construction Engineering $ 0 Local Matching $ 0
Other: Environmental/Permitting/Misc $ 0 Other Funds $ 0
Total $ 6,000,000 Total $ 6,000,000
Project Description:
The District staff has been studying the creation of the Calimesa Lake and Spreading Basin
Project. This project will utilize recycled water for groundwater recharge with provisions for
augmentation with imported water when available.
This project will be located in the Oak Valley Commercial Development and will consist of a lined
pond with adjacent spreading basins and storm water capture basin.