sequencing to reduce overall field time and, in turn, minimize labor, material, and
                       equipment rental costs, (3) a robust, automated manifold and basin‐tree system to
                       maintain required flow and test basin water levels and provide real‐time alerts to project
                       personnel via telemetry, and (4) appropriate traffic controls and site security fencing to
                       ensure public safety for the duration of the project.

                       The proposed Todd Groundwater‐DRE team combines decades of experience in recharge
                       feasibility evaluation and installation and operation of field data acquisition and telemetry
                       systems. Our company profiles are included in the Appendix to this proposal. I am also
                       pleased to offer Edwin Lin as Project Manager. He is an accomplished quantitative
                       hydrogeologist with a specialty in MAR projects. He has recently completed similar field‐
                       infiltration tests for the Mojave Water Agency and Santa Clara Valley Water District. He has
                       carefully considered the needs of Valley District and developed an appropriate scope of
                       work that will ensure successful execution of the Work Plan and collection of essential data
                       for reliable estimation of site recharge capacity. David Drewelow, Vice President of DRE,
                       will construct the water conveyance and flow control systems and supervise all field
                       construction and monitoring activities. David has over 25 years of experience in design,
                       installation, and operation of environmental monitoring and remediation systems and
                       designed the custom manifold and basin‐tree system specified in the Work Plan. DRE is
                       conveniently located in Escondido, CA, a relatively short driving distance to the Yucaipa
                       Basin Area.

                       On behalf of the team, I appreciate the opportunity to assist Valley District with high‐
                       quality hydrogeologic and field engineering consulting. Recognizing the importance of
                       sustainable groundwater resources for the Yucaipa Basin Area, we would be proud to
                       contribute to the future expansion of your regional conjunctive use program.



                                                           Thank you,




                                                           Phyllis Stanin, PG, CHG CEG
                                                           Vice President