Page 64 - Yucaipa Sustainable Groundwater Management Agency - Yucaipa SGMA
P. 64

Well Installation Support, Crown Resources Corporation, Chesaw, WA. Geologist.
                                  Sited well locations, logged borehole lithology, oversaw well construction and development
                                  of a piezometer and a mine dewatering well, and wrote technical memorandum of drilling
                                  activities. Created health and safety plans for expected work. This project involved the
                                  installation of a piezometer to monitor ground water along a fault zone. It also involved
                                  installation of a injection well that will be used to pump treated mine water from the on-site
                                  water treatment plant back into the mine water system.

                                  Settlement Evaluation, Confidential Client, Seattle, WA. Hydrogeologist. Compiled and
                                  analyzed water level, pumping, geologic, and geophysical data to evaluate settlement
                                  damage claims. This project involved our professional assessment of the claims to assist the
                                  client in an ongoing litigation.

                                  I-5 Expansion Support, Parametrix Inc./Washington State Department of
                                  Transportation, Lakewood, WA. Hydrogeologist. Conducted large-scale pit infiltration
                                  testing, assisted with on-site water treatment plant operations, and assisted in data analysis
                                  and report writing. This project involved field data collection to support the design of the I-5
                                  widening project near the Berkeley Avenue interchange.
                                  Settlement Evaluation, Confidential Client, Redmond, WA. Hydrogeologist. Analyzed
                                  seasonal water level data and construction blue prints to evaluate settlement damage claims.
                                  Pioneer Park, HDR Engineering Inc., Tumwater, WA. Hydrogeologist. Conducted slug
                                  test analysis of multiple wells and generated a technical memorandum of results. This
                                  project involved further geotechnical and hydrologic evaluation of a proposed fish hatchery
                                  facility located adjacent to a river channel.
                                  Interceptor Trench Extension, Reserve Silica Corporation, Ravensdale, WA.
                                  Hydrogeologist. Conducted rising head tests and performed initial analysis to estimate
                                  hydraulic properties. This project involved an estimation of aquifer properties that will assist
                                  in the future alignment and design of a trench with the purpose of diverting contaminated
                                  ground water toward the on-site water treatment plant that is located downgradient.
                                  Superfund Site, Confidential Client, Burbank, CA. Hydrogeologist. Sited well locations,
                                  logged borehole lithology, and oversaw well construction and development of two
                                  monitoring wells. Conducted field data collection activities, managed on-site waste disposal
                                  operations, assisted with on-site treatment plant operations, and installed data loggers. This
                                  project involved evaluating contamination transport and ongoing clean-up of the aquifer to
                                  assist client to meet regulatory requirement and assist them in an ongoing litigation.
                                  Superfund Site, Confidential Client, Soda Springs, ID. Hydrogeologist. Created report
                                  graphics and assisted with data analysis that was included in a remedial investigation report
                                  delivered to multiple regulatory agencies.

                                  Superfund Site, Confidential Client, Soda Springs, ID. Geologist. Conducted soil and
                                  sediment collection activities. This project involved field data collection to assist the client
                                  meet regulatory requirements.
                                  Cadman High Rock Quarry Expansion Support, Cadman Inc., Monroe, WA.
                                  Hydrogeologist. Sited well locations, logged borehole lithology, and oversaw well
                                  construction and development of ten monitoring wells of variable lengths. Conducted field
                                  data collection activities, installed data loggers, trained field staff, and interacted with
                                  stakeholders and the client. This project involved evaluating the ground water system to
                                  ensure the planned Quarry expansion doesn’t affect the aquifer that stakeholders actively use
                                  as their drinking water source. It also involved data collection for use in the engineered
                                  design of the expansion area infiltration pond.



                                  Erik Cadaret - Page 2
                              Yucaipa Sustainable Groundwater Management Agency - August 9, 2018 - Page 63 of 208
   59   60   61   62   63   64   65   66   67   68   69